Risk-based shutdown management of LNG units

被引:16
|
作者
Keshavarz, Ghaffar [1 ]
Thodi, Premkumar [1 ]
Khan, Faisal [1 ]
机构
[1] Mem Univ Newfoundland, Fac Engn & Appl Sci, St John, NF A1B 3X5, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
Shutdown; Redundancy; Standby; Preventive maintenance; Minimum risk; Optimum strategy; SURVEILLANCE REQUIREMENTS; MAINTENANCE; OPTIMIZATION; COMPONENTS; SYSTEMS; COST;
D O I
10.1016/j.jlp.2011.08.006
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
Global demand for natural gas may double by 2030, with Liquefied Natural Gas (LNG) growing perhaps fivefold - driven by continued cost reduction. Propane Pre-cooled Mixed Refrigerant (PPMR) of Air Products and Chemicals Inc. (APCI) currently holds 78% of the liquefaction plants on the market. Since the PPMR process has the largest production capacity, its operational reliability needs to be high as any failure may result in catastrophic consequences. Therefore, operational reliability has a key importance in LNG plants. To achieve an acceptable reliability, usually, a constant interval of a preventive maintenance method is used. The limitation of such a method is that the shutdown strategy is not optimum. This study focuses on determining a risk-based shutdown management strategy for APCI plants with capacity of 4.5 million tons per annum. To achieve the minimum risk for the expected life of an LNG plant, a combination of preventive maintenance, active redundancy and standby redundancy is considered. Results of this study reveal that such a combination can significantly reduce the operational risk. This combination (C)improves the plant reliability and maintains it above a minimum operational reliability. (C) 2011 Elsevier Ltd. All rights reserved.
引用
收藏
页码:159 / 165
页数:7
相关论文
共 50 条
  • [41] IDENTITY AND ACCESS MANAGEMENT-A RISK-BASED APPROACH
    Popescu, Ion-Petru
    Barbu, Catalin Alexandru
    Popescu, Madalina Ecaterina
    PROCEEDINGS OF THE 9TH INTERNATIONAL MANAGEMENT CONFERENCE: MANAGEMENT AND INNOVATION FOR COMPETITIVE ADVANTAGE, 2015, : 572 - 580
  • [42] Using Resilience in Risk-Based Asset Management Plans
    Liu, YuanChi
    McNeil, Sue
    TRANSPORTATION RESEARCH RECORD, 2020, 2674 (04) : 178 - 192
  • [43] Stochastic Optimization Models for Risk-Based Reservoir Management*
    Yu. Ermoliev
    T. Ermolieva
    T. Kahil
    M. Obersteiner
    V. Gorbachuk
    P. Knopov
    Cybernetics and Systems Analysis, 2019, 55 : 55 - 64
  • [44] Risk-based forecasting and planning and management earnings forecasts
    Christopher D. Ittner
    Jeremy Michels
    Review of Accounting Studies, 2017, 22 : 1005 - 1047
  • [45] STOCHASTIC OPTIMIZATION MODELS FOR RISK-BASED RESERVOIR MANAGEMENT
    Ermoliev, Yu.
    Ermolieva, T.
    Kahil, T.
    Obersteiner, M.
    Gorbachuk, V.
    Knopov, P.
    CYBERNETICS AND SYSTEMS ANALYSIS, 2019, 55 (01) : 55 - 64
  • [46] Towards risk-based flood hazard management in the UK
    Sayers, PB
    Hall, JW
    Meadowcroft, IC
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 2002, 150 : 36 - 42
  • [47] The Benefit of Informed Risk-Based Management of Civil Infrastructures
    Giordano, Pier Francesco
    Limongelli, Maria Pina
    INFRASTRUCTURES, 2022, 7 (12)
  • [48] Risk-based air pollutants management at regional levels
    Xu, Jianhua
    Wang, Xuesong
    Zhang, Shiqiu
    ENVIRONMENTAL SCIENCE & POLICY, 2013, 25 : 167 - 175
  • [49] Potomac river risk-based water supply management
    Schwartz, SS
    WATER RESOURCES AND THE URBAN ENVIRONMENT, 1998, : 437 - 442
  • [50] The Concept of Risk-based Management in The Activity of Business Organizations
    Baryshev, Andrei
    Shchegolev, Alexandr
    Golovina, Tatyana
    Polyanin, Andrey
    Polozhentseva, Yulia
    VISION 2020: SUSTAINABLE ECONOMIC DEVELOPMENT AND APPLICATION OF INNOVATION MANAGEMENT, 2018, : 4374 - 4383