Research on Software Project Risk Assessment Model based on Fuzzy Theory and Improved

被引:0
|
作者
Yu, Zhenyu [1 ,2 ]
Yang, Kun [1 ,2 ]
Luo, Yi [1 ,2 ]
Deng, Qiongfei [1 ,2 ]
机构
[1] Yunnan Normal Univ, Inst Informat, Kunming, Yunnan, Peoples R China
[2] Minist Educ, Engn Res Ctr GIS Technol Western China, Kunming, Yunnan, Peoples R China
关键词
Fuzzy Theory; AHP; Software project; Risk assessment model; Pearson correlation coefficient;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In order to effectively control the risk of software project and overcome the effect of lack data and human subjective factors in the traditional evaluation, the transformation of quantification and reduction of natural language is realized, so a new evaluation model is put forward. Based on the concepts of risk weight, expert trust, risk consequence and so on, we use the correlation coefficient to associate the historical data, so that the assessor can measure the impact of the risk factors from the macroscopic and microscopic angles.By case study, the model is objective and scientific, and it has good practicability and provides a reliable basis for risk prediction, mitigation and control.
引用
收藏
页码:2073 / 2077
页数:5
相关论文
共 50 条
  • [21] Research on the Risk Assessment of Railway Engineering Project Based on FAHP Model
    Li, Suying
    Tian, Ya
    Wu, Yongli
    [J]. Journal of Railway Engineering Society, 2019, 36 (07) : 92 - 99
  • [22] Fuzzy Based Risk Register for Construction Project Risk Assessment
    Kuchta, Dorota
    Ptaszynska, Ewa
    [J]. PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON NUMERICAL ANALYSIS AND APPLIED MATHEMATICS 2016 (ICNAAM-2016), 2017, 1863
  • [23] Research and Analysis on Software Project Risk Based on Bibliometrics
    Qu, Ying
    Fan, Moran
    [J]. PROCEEDINGS OF THE 2018 2ND INTERNATIONAL CONFERENCE ON ECONOMIC DEVELOPMENT AND EDUCATION MANAGEMENT (ICEDEM 2018), 2018, 290 : 138 - 142
  • [24] The Integrated Optimization Research on Software Project Development Process Based on Fuzzy Multi-attribute Theory
    Shan, Xiaohong
    Xang, GuoRui
    Huang, Tiyun
    [J]. 2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 7606 - +
  • [25] An evaluation model of project progress risk level based on variable fuzzy set theory
    Huang Wen-jie
    Fu Li
    [J]. PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON LOGISTICS SYSTEMS AND INTELLIGENT MANAGEMENT, VOLS 1-3, 2010, : 1046 - 1049
  • [26] Software Dependability Evaluation Model Based on Fuzzy Theory
    Shi Huiling
    Ma Jun
    Zou Fengyi
    [J]. PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND INFORMATION TECHNOLOGY, 2008, : 102 - 106
  • [27] Research of project risk assessment based on SPA
    Liu, Jun'e
    Lu, Rongrong
    Guo, Zhanglin
    [J]. PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON RISK AND RELIABILITY MANAGEMENT, VOLS I AND II, 2008, : 392 - 395
  • [28] Project cost prediction model based on fuzzy Theory
    [J]. 1600, Academy Publisher (08):
  • [29] Research on equilibrium model of risk allocation in construction project based on game theory
    Zhang, EW
    Li, QM
    Deng, XP
    [J]. PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, 2004, : 253 - 256
  • [30] A Computerized Method for Delay Risk Assessment Based on Fuzzy Set Theory using MS Project™
    Cenk Budayan
    Irem Dikmen
    M. Talat Birgonul
    Aydın Ghaziani
    [J]. KSCE Journal of Civil Engineering, 2018, 22 : 2714 - 2725