共 50 条
- [22] Fuzzy Based Risk Register for Construction Project Risk Assessment [J]. PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON NUMERICAL ANALYSIS AND APPLIED MATHEMATICS 2016 (ICNAAM-2016), 2017, 1863
- [23] Research and Analysis on Software Project Risk Based on Bibliometrics [J]. PROCEEDINGS OF THE 2018 2ND INTERNATIONAL CONFERENCE ON ECONOMIC DEVELOPMENT AND EDUCATION MANAGEMENT (ICEDEM 2018), 2018, 290 : 138 - 142
- [24] The Integrated Optimization Research on Software Project Development Process Based on Fuzzy Multi-attribute Theory [J]. 2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 7606 - +
- [25] An evaluation model of project progress risk level based on variable fuzzy set theory [J]. PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON LOGISTICS SYSTEMS AND INTELLIGENT MANAGEMENT, VOLS 1-3, 2010, : 1046 - 1049
- [26] Software Dependability Evaluation Model Based on Fuzzy Theory [J]. PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND INFORMATION TECHNOLOGY, 2008, : 102 - 106
- [27] Research of project risk assessment based on SPA [J]. PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON RISK AND RELIABILITY MANAGEMENT, VOLS I AND II, 2008, : 392 - 395
- [29] Research on equilibrium model of risk allocation in construction project based on game theory [J]. PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, 2004, : 253 - 256
- [30] A Computerized Method for Delay Risk Assessment Based on Fuzzy Set Theory using MS Project™ [J]. KSCE Journal of Civil Engineering, 2018, 22 : 2714 - 2725