Royalty Analysis for BOT Projects Based on The Negotiation Viewpoint

被引:0
|
作者
Kang, Chao-Chung [1 ]
Feng, Cheng-Min [2 ]
Kuo, Chiu-Yen [2 ]
机构
[1] Providence Univ, Dept Business Adm, Shalu, Taichung Hsien, Taiwan
[2] Natl Chiao Tung Univ, Inst Traff & Transportat, Taipei, Taiwan
关键词
BOT; royalty; negotiation; bi-level programming;
D O I
10.1109/IEEM.2009.5373178
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This study constructs three royalty negotiation models, including the lump-sum royalty, operational revenue-based royalty, and operational output-based royalty, using the bi-level programming approach. In addition, this paper also develops the iterative algorithm for bi-level programming problem for the government and the private sector. A number of factors were incorporated into this algorithm including concession rate, time value discount rate, learning rate and number of negotiations.
引用
收藏
页码:1820 / +
页数:2
相关论文
共 50 条
  • [21] Concession decision model of BOT projects based on a real options approach
    Yang Wei-hua
    Dai Da-shuang
    PROCEEDINGS OF THE 2006 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (13TH), VOLS 1-3, 2006, : 307 - 312
  • [22] Risk Assessment of BOT Infrastructure Projects for Contractors Based on GIOWA Operator
    Su, Shuanglei
    He, Shoukui
    PROCEEDINGS OF THE 16TH INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE (CRIOCM2011), 2011, : 183 - 186
  • [23] A CBR-based support system of quick BOT projects bids
    Yu, Yong-He
    Shan, Mi-Yuan
    Li, Shu-Yan
    PROCEEDINGS OF 2006 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2006, : 2059 - +
  • [24] Research on the Government Behavior in the Operation of Infrastructure Projects Based on BOT Mode
    Zhao, Jianna
    Li, Xiangnan
    FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING, PTS 1-8, 2011, 71-78 : 3043 - 3047
  • [26] Breach of Contract and Deposit in BOT Projects
    Shi, Lei
    Huang, Winlin
    Dai, Dashuang
    2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 7745 - 7749
  • [27] BOT financing in public infrastructure projects
    Mao, CK
    Chang, LM
    CONSTRUCTION CONGRESS VI, PROCEEDING: BUILDING TOGETHER FOR A BETTER TOMORROW IN AN INCREASINGLY COMPLEX WORLD, 2000, : 868 - 877
  • [28] The impact of foreign currency on BOT projects
    Chandra, F
    Chang, LM
    CONSTRUCTION CONGRESS VI, PROCEEDING: BUILDING TOGETHER FOR A BETTER TOMORROW IN AN INCREASINGLY COMPLEX WORLD, 2000, : 878 - 888
  • [29] Contract conditions of BOT projects in China
    Li Jie
    Zou, P. X. W.
    Cheng Hu
    Dai Zhaohua
    PROCEEDINGS OF CRIOCM 2007 INTERNATIONAL RESEARCH SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1 AND 2, 2007, : 966 - 979
  • [30] Controlling Vehicle Overloading in BOT Projects
    Bagui, Swapan
    Das, Atasi
    Bapanapalli, Chiranjeevi
    2ND CONFERENCE OF TRANSPORTATION RESEARCH GROUP OF INDIA (2ND CTRG), 2013, 104 : 962 - 971