Royalty Analysis for BOT Projects Based on The Negotiation Viewpoint

被引:0
|
作者
Kang, Chao-Chung [1 ]
Feng, Cheng-Min [2 ]
Kuo, Chiu-Yen [2 ]
机构
[1] Providence Univ, Dept Business Adm, Shalu, Taichung Hsien, Taiwan
[2] Natl Chiao Tung Univ, Inst Traff & Transportat, Taipei, Taiwan
关键词
BOT; royalty; negotiation; bi-level programming;
D O I
10.1109/IEEM.2009.5373178
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This study constructs three royalty negotiation models, including the lump-sum royalty, operational revenue-based royalty, and operational output-based royalty, using the bi-level programming approach. In addition, this paper also develops the iterative algorithm for bi-level programming problem for the government and the private sector. A number of factors were incorporated into this algorithm including concession rate, time value discount rate, learning rate and number of negotiations.
引用
收藏
页码:1820 / +
页数:2
相关论文
共 50 条
  • [31] Bidding Quotation Model for BOT Projects Based on Case Based Reasoning and Wavelet Network
    Yu, Yonghe
    Ma, Weimin
    Li, Suyan
    Li, Guo
    PROCEEDINGS OF THE EIGHTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2009, 8 : 127 - 131
  • [32] Bot detection based on traffic analysis
    Kugisaki, Yuji
    Kasahara, Yoshiaki
    Hori, Yoshiaki
    Sakurai, Kouichi
    2007 INTERNATIONAL CONFERENCE ON INTELLIGENT PERVASIVE COMPUTING, PROCEEDINGS, 2007, : 303 - +
  • [33] Attitude-Based Strategic Negotiation for Conflict Management in Construction Projects
    Yousefi, Saied
    Hipel, Keith W.
    Hegazy, Tarek
    PROJECT MANAGEMENT JOURNAL, 2010, 41 (04) : 99 - 107
  • [34] Analysis of traffic revenue risk factors in BOT road projects in developing countries
    Babatunde, Solomon Olusola
    Perera, Srinath
    TRANSPORT POLICY, 2017, 56 : 41 - 49
  • [35] REGIONAL PROJECTS AND AN EXTENSION VIEWPOINT
    GAUNT, SN
    JOURNAL OF DAIRY SCIENCE, 1960, 43 (10) : 1532 - 1534
  • [36] The settlement of contract negotiation disputes: A labor viewpoint
    Shishkin, Boris
    LAW AND CONTEMPORARY PROBLEMS, 1947, 12 (02) : 357 - 366
  • [37] The settlement of contract negotiation disputes: A business viewpoint
    Fitzpatrick, Bernard H.
    LAW AND CONTEMPORARY PROBLEMS, 1947, 12 (02) : 346 - 356
  • [38] The Application of Real Option in Model for Infrastructure BOT Projects Based on Option Game
    Zhang, Junsheng
    Shi, Shenxiang
    Wang, Shijing
    2012 INTERNATIONAL CONFERENCE ON FUTURE INFORMATION TECHNOLOGY AND MANAGEMENT SCIENCE & ENGINEERING (FITMSE 2012), 2012, 14 : 580 - 585
  • [39] A LEGAL ANALYSIS OF SUCCESSFUL AND PROBLEMATIC BUILD OPERATE AND TRANSFER (BOT) PROJECTS IN MALAYSIA
    Markom, Ruzian
    Ali, Engku Rabiah Adawiah Engku
    INTERNATIONAL JOURNAL OF BUSINESS AND SOCIETY, 2012, 13 (02): : 133 - 150
  • [40] Evaluation of Delay Causes for BOT Projects Based on Perceptions of Different Stakeholders in Turkey
    Budayan, Cenk
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2019, 35 (01)