Risk Assessment of BOT Infrastructure Projects for Contractors Based on GIOWA Operator

被引:0
|
作者
Su, Shuanglei [1 ]
He, Shoukui [1 ]
机构
[1] Chongqing Jiaotong Univ, Sch Management, Chongqing, Peoples R China
关键词
BOT; infrastructure projects; risk assessment model; GlOWA operator;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
BOT as a international engineering construction model involved in large infrastructure projects which have complex structure, long construction period,high cost,and many other factors.To make BOT contractor accurately assess the risk in this project, thereby formulate risk countermeasures according to the evaluation results, this paper analysis all kinds of potential risk factors in the construction phase from the angle of the contractor, which constructs three-level index system of risk assessment.By using the method of AHP based on GIOWA operator,it sets up a risk assessment model for BOT construction project,and divide the risks impact into five grades to analysis.Empirical shows that the method is reasonable and feasible.
引用
收藏
页码:183 / 186
页数:4
相关论文
共 50 条
  • [1] BOT financing in public infrastructure projects
    Mao, CK
    Chang, LM
    [J]. CONSTRUCTION CONGRESS VI, PROCEEDING: BUILDING TOGETHER FOR A BETTER TOMORROW IN AN INCREASINGLY COMPLEX WORLD, 2000, : 868 - 877
  • [2] Governance issues in BOT based PPP infrastructure projects in India
    Delhi, Venkata Santosh Kumar
    Mahalingam, Ashwin
    Palukuri, Seshanka
    [J]. BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2012, 2 (02) : 234 - 249
  • [3] Decision Framework for Efficient Risk Mitigation in BOT Highway Infrastructure Service Projects
    Dhanshyam, Mahavadi
    Srivastava, Samir K.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2023, 149 (09)
  • [4] Options-based negotiation management of PPP–BOT infrastructure projects
    Attarzadeh, Meghdad
    Chua, David K.H.
    Beer, Michael
    Abbott, Ernest L.S.
    [J]. Construction Management and Economics, 2017, 35 (11-12) : 676 - 692
  • [5] Research on the Government Behavior in the Operation of Infrastructure Projects Based on BOT Mode
    Zhao, Jianna
    Li, Xiangnan
    [J]. FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING, PTS 1-8, 2011, 71-78 : 3043 - 3047
  • [6] Application of BOT system for infrastructure projects in China
    Shen, LY
    Lee, RKH
    Zhang, ZH
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1996, 122 (04): : 319 - 323
  • [7] Examining owners' and contractors' motivations to participate in collaborative risk management of mega infrastructure projects
    Li, Yuanli
    Xiang, Pengcheng
    Chan, Paul W.
    Zhang, Jinwen
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2024, 42 (05)
  • [8] The risk assessment of overseas infrastructure project by PPP/BOT mode
    Ren, LA
    Tao, P
    [J]. Proceedings of 2005 International Conference on Construction & Real Estate Management, Vols 1 and 2: CHALLENGE OF INNOVATION IN CONSTRUCTION AND REAL ESTATE, 2005, : 1089 - 1091
  • [9] Risk Based Budgeting of Infrastructure Projects
    Xenidis, Yiannis
    Stavrakas, Eleftherios
    [J]. SELECTED PAPERS FROM THE 26TH IPMA (INTERNATIONAL PROJECT MANAGEMENT ASSOCIATION), WORLD CONGRESS, 2013, 74 : 478 - 487
  • [10] Financial risk assessment and modelling of PPP based Indian highway infrastructure projects
    Kumar, Lakshya
    Jindal, Apurva
    Velaga, Nagendra R.
    [J]. TRANSPORT POLICY, 2018, 62 : 2 - 11