Options-based negotiation management of PPP–BOT infrastructure projects

被引:20
|
作者
Attarzadeh M. [1 ,2 ]
Chua D.K.H. [1 ]
Beer M. [3 ,4 ,5 ]
Abbott E.L.S. [1 ]
机构
[1] Department of Civil and Environmental Engineering, National University of Singapore (NUS), Singapore
[2] School of Civil and Environmental Engineering, Nanyang Technological University (NTU), Singapore
[3] Institute for Risk and Reliability, Leibniz Universität Hannover
[4] Institute for Risk and Uncertainty, University of Liverpool, Liverpool
[5] International Joint Research Center for Engineering Reliability and Stochastic Mechanics (ERSM), Tongji University, Shanghai
关键词
build–operate–transfer; negotiation; private finance; public–private partnerships; Real options;
D O I
10.1080/01446193.2017.1325962
中图分类号
学科分类号
摘要
The success of public–private partnership (PPP)–build–operate–transfer (BOT) projects largely depends on effectively mitigating the impact of a variety of risks and uncertainties, especially those influencing the revenue over time. Revenue instability is one of the main obstacles of PPP form of procurement. Government support, which is established as a clause in the concession agreement, should be carefully designed and well formulated. Options which arise from certain clauses in the contract are more valuable for risky projects. The purpose of this paper’s proposed model is to evaluate early fund generation options and also to calculate equitable bounds for a guaranteed revenue for the project sponsor under uncertainty and risk. The model is specially designed to alleviate the concern of revenue risk. To illustrate its applicability the methodology is then applied to a freeway PPP project and a power plant PPP project in Iran. The results show that the value of these options can indeed be significant and by applying the proposed systematic negotiation mechanism both public and private sectors can take advantage of its flexibility at the negotiation table. The proposed mechanisms can facilitate negotiations on the verge of a break down as well as accelerating ongoing negotiations that have become moribund. © 2017 Informa UK Limited, trading as Taylor & Francis Group.
引用
收藏
页码:676 / 692
页数:16
相关论文
共 50 条
  • [1] Governance issues in BOT based PPP infrastructure projects in India
    Delhi, Venkata Santosh Kumar
    Mahalingam, Ashwin
    Palukuri, Seshanka
    BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2012, 2 (02) : 234 - 249
  • [2] Optimized real options-based approach for government guarantees in PPP toll road projects
    Buyukyoran, Faruk
    Gundes, Selin
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2018, 36 (04) : 203 - 216
  • [3] Royalty Analysis for BOT Projects Based on The Negotiation Viewpoint
    Kang, Chao-Chung
    Feng, Cheng-Min
    Kuo, Chiu-Yen
    2009 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4, 2009, : 1820 - +
  • [4] Credit risk in infrastructure PPP projects under the real options approach
    Quimbayo, Carlos Andres Zapata
    Vega, Carlos Armando Mejia
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2023, 41 (04) : 293 - 306
  • [5] Studies on Risk Management of the Urban Infrastructure Projects Based on the PPP Financing Model
    Chen, Hanli
    Ma, ChaoQun
    Liu, Bo
    Qin, Tao
    2009 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND LOGISTICS ( ICAL 2009), VOLS 1-3, 2009, : 1614 - +
  • [6] BOT financing in public infrastructure projects
    Mao, CK
    Chang, LM
    CONSTRUCTION CONGRESS VI, PROCEEDING: BUILDING TOGETHER FOR A BETTER TOMORROW IN AN INCREASINGLY COMPLEX WORLD, 2000, : 868 - 877
  • [7] Strategic options-based framework for management of dynamic capabilities in manufacturing firms
    Kylaheiko, Kalevi
    Sandstrom, Jaana
    JOURNAL OF MANUFACTURING TECHNOLOGY MANAGEMENT, 2007, 18 (08) : 966 - 984
  • [8] CSFs in competitive tendering and negotiation model for BOT projects
    Tiong, RLK
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1996, 122 (03): : 205 - 211
  • [9] A life-cycle risk management framework for PPP infrastructure projects
    Zou, Patrick
    Wang, Shouqing
    Fang, Dongping
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2008, 13 (02) : 123 - +
  • [10] Risk Assessment of BOT Infrastructure Projects for Contractors Based on GIOWA Operator
    Su, Shuanglei
    He, Shoukui
    PROCEEDINGS OF THE 16TH INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE (CRIOCM2011), 2011, : 183 - 186