Disassembly Modeling in Ship Maintenance with Consideration of the Influence of Fasteners

被引:0
|
作者
Zhang Hua [1 ]
Mu Minhao [1 ]
Fang Zhou [2 ]
Qiu Yue [2 ]
Yi Pengxing [2 ]
机构
[1] Wuhan Second Ship Design & Res Inst, Wuhan, Hubei, Peoples R China
[2] Huazhong Univ Sci & Technol, Sch Mech Sci & Engn, Wuhan 430074, Peoples R China
关键词
Disassembly modeling; Fastener; Constraint relations; Interference matrix;
D O I
10.1117/12.2589423
中图分类号
TP31 [计算机软件];
学科分类号
081202 ; 0835 ;
摘要
Disassembly sequence planning is an important part of maintenance, and disassembly modeling is the premise of sequence planning. Due to a large number of parts and complex structure, it is difficult to model the disassembly process for ship maintenance. In this paper, we proposed a disassembly modeling method with consideration of the relationship between the general parts and fasteners. At first, we analyzed the disassembly rules of fasteners and the constraints of fasteners, determined the hidden priority relation of part, and established the fastener relation table. At the same time, the relation table of fasteners and the interference matrix of parts were synthesized, and the constraint interference matrix considering the influence of fasteners was established. Based on this proposed modeling method, the judgment criterion of part disassembly and the disassembly rule of fasteners were put forward, and the effectiveness and superiority of the method were illustrated with an application case.
引用
收藏
页数:6
相关论文
共 50 条
  • [11] Second generation of pressure sensitive fasteners for active disassembly
    Peeters, Jef R.
    Van den Bossche, Wannes
    Devoldere, Tom
    Dewulf, Wim
    Duflou, Joost R.
    21ST CIRP CONFERENCE ON LIFE CYCLE ENGINEERING, 2014, 15 : 228 - 233
  • [12] INFLUENCE OF SHIP DESIGN AND FABRICATION ON UNDERWATER MAINTENANCE AND REPAIR
    MCCORD, RS
    MARINE TECHNOLOGY AND SNAME NEWS, 1983, 20 (02): : 177 - 183
  • [13] Analysis on Factors Impeding the Disassembly Process with Consideration on Automated Disassembly Planning
    Abdullah, Nurhidayu
    Jafar, Fairul Azni
    Maslan, Mohd Nazmin
    2ND INTERNATIONAL MATERIALS, INDUSTRIAL, AND MANUFACTURING ENGINEERING CONFERENCE, MIMEC2015, 2015, 2 : 191 - 195
  • [14] Modeling Disassembly
    Taron, Joshua M.
    2016 IEEE 1ST INTERNATIONAL WORKSHOPS ON FOUNDATIONS AND APPLICATIONS OF SELF* SYSTEMS (FAS*W), 2016, : 145 - 147
  • [15] Disassembly sequencing for maintenance: a survey
    Kang, Jun-Gyu
    Xirouchakis, P.
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2006, 220 (10) : 1697 - 1716
  • [16] INFLUENCE OF SHIP DESIGN AND FABRICATION ON UNDERWATER MAINTENANCE AND REPAIR.
    McCord, Ray Scott
    Marine Technology, 1983, 20 (02): : 177 - 183
  • [17] Modeling an optimal track maintenance schedule in consideration of train derailment risk
    Miwa, Masashi
    Mizuno, Masatoshi
    Quarterly Report of RTRI (Railway Technical Research Institute), 2014, 55 (01) : 51 - 59
  • [18] Modeling an optimal track maintenance schedule in consideration of timing of grinding and tamping
    Matsumoto M.
    Miwa M.
    Quarterly Report of RTRI (Railway Technical Research Institute), 2017, 58 (03) : 229 - 235
  • [19] Economic and Environmental Evaluation of Fasteners for Active Disassembly: A Case Study for Payment Terminals
    Peeters, Jef R.
    Vanegas, Paul
    Dewulf, Wim
    Duflou, Joost R.
    22ND CIRP CONFERENCE ON LIFE CYCLE ENGINEERING, 2015, 29 : 704 - 709
  • [20] DISASSEMBLY SEQUENCE PLANNING FOR PRODUCT MAINTENANCE
    Luo, Yongtao
    Peng, Qingjin
    PROCEEDINGS OF THE ASME INTERNATIONAL DESIGN ENGINEERING TECHNICAL CONFERENCES AND COMPUTERS AND INFORMATION IN ENGINEERING CONFERENCE, VOL 5, 2012, : 601 - 609