Disassembly Modeling in Ship Maintenance with Consideration of the Influence of Fasteners

被引:0
|
作者
Zhang Hua [1 ]
Mu Minhao [1 ]
Fang Zhou [2 ]
Qiu Yue [2 ]
Yi Pengxing [2 ]
机构
[1] Wuhan Second Ship Design & Res Inst, Wuhan, Hubei, Peoples R China
[2] Huazhong Univ Sci & Technol, Sch Mech Sci & Engn, Wuhan 430074, Peoples R China
关键词
Disassembly modeling; Fastener; Constraint relations; Interference matrix;
D O I
10.1117/12.2589423
中图分类号
TP31 [计算机软件];
学科分类号
081202 ; 0835 ;
摘要
Disassembly sequence planning is an important part of maintenance, and disassembly modeling is the premise of sequence planning. Due to a large number of parts and complex structure, it is difficult to model the disassembly process for ship maintenance. In this paper, we proposed a disassembly modeling method with consideration of the relationship between the general parts and fasteners. At first, we analyzed the disassembly rules of fasteners and the constraints of fasteners, determined the hidden priority relation of part, and established the fastener relation table. At the same time, the relation table of fasteners and the interference matrix of parts were synthesized, and the constraint interference matrix considering the influence of fasteners was established. Based on this proposed modeling method, the judgment criterion of part disassembly and the disassembly rule of fasteners were put forward, and the effectiveness and superiority of the method were illustrated with an application case.
引用
收藏
页数:6
相关论文
共 50 条
  • [21] Virtual Disassembly and Evaluation of Virtual Maintenance
    Qing, He
    PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY AND INDUSTRIAL ENGINEERING, VOLS I AND II, 2010, : 229 - 232
  • [22] A disassembly Sequence Planning Approach for maintenance
    Kheder, Maroua
    Trigui, Moez
    Aifaoui, Nizar
    ADVANCES ON MECHANICS, DESIGN ENGINEERING AND MANUFACTURING, 2017, : 81 - 89
  • [23] SHIP MACHINERY MAINTENANCE
    Segulja, Ivica
    Buksa, Ante
    POMORSTVO-SCIENTIFIC JOURNAL OF MARITIME RESEARCH, 2006, 20 (02) : 105 - 118
  • [24] Optimisation of ship maintenance
    Coletta, G
    Guassardo, G
    Vergine, A
    MER-MARINE ENGINEERS REVIEW, 2000, : 29 - 30
  • [25] Preventive maintenance modeling for multi-component systems with considering stochastic failures and disassembly sequence
    Zhou, Xiaojun
    Huang, Kaimin
    Xi, Lifeng
    Lee, Jay
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2015, 142 : 231 - 237
  • [26] Friction modeling and experimentation for integral fasteners
    Sawyer, WG
    Blanchet, TA
    Knapp, KN
    Lee, DY
    ANTEC'97 - PLASTICS SAVING PLANET EARTH, CONFERENCE PROCEEDINGS, VOLS 1 - 3, 1997, : 1193 - 1197
  • [27] Partial Disassembly and Consideration of Part Relationships in Multiproduct, Multiperiod Capacitated Disassembly Scheduling With Parts Commonality
    Zare, Sajed
    Fakhrzad, Mohammad Bagher
    Zare, Hassan Khademi
    Hosseini-Nasab, Hasan
    MODELLING AND SIMULATION IN ENGINEERING, 2024, 2024
  • [28] Automatic Classification and Disassembly of Fasteners in Industrial 3D CAD-Scenarios
    Adesso, Michele F.
    Hegewald, Robert
    Wolpert, Nicola
    Schoemer, Elmar
    Maier, Bianca
    Epple, Benjamin A.
    2022 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION, ICRA 2022, 2022, : 9874 - 9880
  • [29] INFLUENCE OF THE ZINC GALVANIZING ON FASTENERS CRACKING
    Szlapa, Ilona
    Jedrzejczyk, Dariusz
    Skotnicki, Wojciech
    METAL 2016: 25TH ANNIVERSARY INTERNATIONAL CONFERENCE ON METALLURGY AND MATERIALS, 2016, : 928 - 933
  • [30] DISASSEMBLY PROCESS PLANNING TRADEOFFS FOR PRODUCT MAINTENANCE
    Behdad, Sara
    Thurston, Deborah
    PROCEEDINGS OF THE ASME INTERNATIONAL DESIGN ENGINEERING TECHNICAL CONFERENCES AND COMPUTERS AND INFORMATION IN ENGINEERING CONFERENCE, DETC 2010, VOL 6, 2010, : 427 - 434