Modeling an optimal track maintenance schedule in consideration of timing of grinding and tamping

被引:0
|
作者
Matsumoto M. [1 ]
Miwa M. [1 ]
机构
[1] Track Geometry and Maintenance Laboratory, Track Technology Division
关键词
Grinding; Maintenance cycle; Optimization model; Scheduling; Tamping; Track maintenance;
D O I
10.2219/rtriqr.58.3_229
中图分类号
学科分类号
摘要
Today, tamping machines and rail grinding machines are used to maintain ballasted tracks and to remove rail surface irregularities, respectively. Even though maintenance cycles could be extended and the total cost of maintenance could be reduced by efficiently combining these two machines, they are usually operated independently. As such, in order to estimate the effect of combining both these machines (combined maintenance), a model has been designed along with a scheduling system, as a simple method for preparing maintenance schedules which combine tamping and grinding. Investigations were also carried out to establish how long this type of maintenance lasts, and determine the optimum level of combined maintenance.
引用
收藏
页码:229 / 235
页数:6
相关论文
共 50 条
  • [1] Modeling an optimal track maintenance schedule in consideration of train derailment risk
    Miwa, Masashi
    Mizuno, Masatoshi
    Quarterly Report of RTRI (Railway Technical Research Institute), 2014, 55 (01) : 51 - 59
  • [2] Mathematical modeling analyses for obtaining an optimal railway track maintenance schedule
    Oyama, Tatsuo
    Miwa, Masashi
    JAPAN JOURNAL OF INDUSTRIAL AND APPLIED MATHEMATICS, 2006, 23 (02) : 207 - 224
  • [3] Mathematical modeling analyses for obtaining an optimal railway track maintenance schedule
    Tatsuo Oyama
    Masashi Miwa
    Japan Journal of Industrial and Applied Mathematics, 2006, 23
  • [4] Mathematical programming model analysis for the optimal track maintenance schedule
    Miwa, Masashi
    Quarterly Report of RTRI (Railway Technical Research Institute) (Japan), 2002, 43 (03): : 131 - 136
  • [5] Tamping and Grinding Operation Planning Model Considering Track State
    Xu, Yude
    Zhang, Xi
    Liu, Silei
    Wu, Xuanqing
    Tongji Daxue Xuebao/Journal of Tongji University, 2024, 52 (12): : 1929 - 1937
  • [6] Geometric Irregularity Prediction Model of Ballasted Track Considering Tamping and Grinding
    Xu Y.
    Wu X.
    Liu S.
    Xue Z.
    Li S.
    Li C.
    Tongji Daxue Xuebao/Journal of Tongji University, 2023, 51 (01): : 99 - 107
  • [7] Optimal opportunistic tamping scheduling for railway track geometry
    Khajehei, Hamid
    Haddadzade, Mohammad
    Ahmadi, Alireza
    Soleimanmeigouni, Iman
    Nissen, Arne
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2021, 17 (10) : 1299 - 1314
  • [8] Optimisation of maintenance track possession time: A tamping case study
    Famurewa, Stephen M.
    Xin, Tao
    Rantatalo, Matti
    Kumar, Uday
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART F-JOURNAL OF RAIL AND RAPID TRANSIT, 2015, 229 (01) : 12 - 22
  • [9] Optimisation of maintenance track possession time: A tamping case study
    Division of Operation and Maintenance Engineering, Luleå University of Technology, Luleå
    971 87, Sweden
    不详
    不详
    Proc Inst Mech Eng Part F J Rail Rapid Transit, 1 (12-22):
  • [10] An optimal track maintenance scheduling model analysis taking the risk of accidents into consideration
    Miwa, Masashi
    Oyama, Tatsuo
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2018, 25 (05) : 1465 - 1490