Modeling an optimal track maintenance schedule in consideration of timing of grinding and tamping

被引:0
|
作者
Matsumoto M. [1 ]
Miwa M. [1 ]
机构
[1] Track Geometry and Maintenance Laboratory, Track Technology Division
关键词
Grinding; Maintenance cycle; Optimization model; Scheduling; Tamping; Track maintenance;
D O I
10.2219/rtriqr.58.3_229
中图分类号
学科分类号
摘要
Today, tamping machines and rail grinding machines are used to maintain ballasted tracks and to remove rail surface irregularities, respectively. Even though maintenance cycles could be extended and the total cost of maintenance could be reduced by efficiently combining these two machines, they are usually operated independently. As such, in order to estimate the effect of combining both these machines (combined maintenance), a model has been designed along with a scheduling system, as a simple method for preparing maintenance schedules which combine tamping and grinding. Investigations were also carried out to establish how long this type of maintenance lasts, and determine the optimum level of combined maintenance.
引用
收藏
页码:229 / 235
页数:6
相关论文
共 50 条
  • [41] Optimal pricing policies for services with consideration of facility maintenance costs
    Yeh, Ruey Huei
    Lin, Yi-Fang
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 2012, 43 (06) : 1123 - 1132
  • [42] Modeling and optimizing maintenance schedule for energy systems subject to degradation
    Xia, Tangbin
    Xi, Lifeng
    Zhou, Xiaojun
    Du, Shichang
    COMPUTERS & INDUSTRIAL ENGINEERING, 2012, 63 (03) : 607 - 614
  • [43] Consideration of micro-interaction in the modeling of generating gear grinding processes
    Teixeira, Patricia de Oliveira
    Brimmers, J.
    Bergs, T.
    FORSCHUNG IM INGENIEURWESEN-ENGINEERING RESEARCH, 2022, 86 (03): : 639 - 647
  • [44] OPTIMAL PREVENTIVE MAINTENANCE SCHEDULE OF SLEWING RINGS FOR DEMANDING PRODUCTION MACHINE
    Straka, Luboslav
    Panda, Anton
    MM SCIENCE JOURNAL, 2018, 2018 : 2696 - 2700
  • [45] Optimal production run length and maintenance schedule for a deteriorating production system
    Tzu-Hsien Lee
    The International Journal of Advanced Manufacturing Technology, 2009, 43 : 959 - 963
  • [46] An Optimal Method to Schedule Dynamic Maintenance Task with Subject Taken into Account
    王正元
    严小琴
    朱昱
    宋建社
    Journal of China Ordnance, 2010, (02) : 155 - 160
  • [47] Optimal production run length and maintenance schedule for a deteriorating production system
    Lee, Tzu-Hsien
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 43 (9-10): : 959 - 963
  • [48] Optimal working zone division for safe track maintenance in The Netherlands
    den Hertog, D
    van Zante-de Fokkert, JI
    Sjamaar, SA
    Beusmans, R
    ACCIDENT ANALYSIS AND PREVENTION, 2005, 37 (05): : 890 - 893
  • [49] Optimal track utilization in electric multiple unit maintenance depots
    Li, Haodong
    Jin, Mingzhou
    He, Shiwei
    Ye, Zhirui
    Song, Jinglu
    COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 108 : 81 - 87
  • [50] Optimal Shape Design of Supported Structure for Inner Race Track Grinding Machine
    Han, Hye Won
    Han, Seung Ho
    TRANSACTIONS OF THE KOREAN SOCIETY OF MECHANICAL ENGINEERS A, 2020, 44 (03) : 221 - 227