Analysis on Factors Impeding the Disassembly Process with Consideration on Automated Disassembly Planning

被引:5
|
作者
Abdullah, Nurhidayu [1 ]
Jafar, Fairul Azni [2 ]
Maslan, Mohd Nazmin [2 ]
机构
[1] Univ Tekn Malaysia Melaka, Grad Sch Engn, Durian Tunggal 76100, Melaka, Malaysia
[2] Univ Tekn Malaysia Melaka, Fac Mfg Engn, Durian Tunggal 76100, Melaka, Malaysia
关键词
Disassembly; Reverse-assembly; Manual Disassembly; Semi-automated Disassembly;
D O I
10.1016/j.promfg.2015.07.033
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Disassembly is one of the most important elements of product recovery operations. Most of the open literatures on the disassembly process were focused mainly on the method, sequencing and planning. The optimum disassembly sequence of a product for industrial recycling and remanufacturing requires the intervention of an expert in the work areas. In addition to these literatures, systematic studies on the disassembly are still needed for better understanding of its elements. Thus, an experimental investigation was conducted to re-evaluate the first existing approach of disassembly process; reverse-assembly method in disassembling table top fan. To measure the performances of the method, experiments are conducted in reverse assemble method in two ways; manual disassembly and semi-automated disassembly. This is due to the fact that this research work is considering on developing an optimum disassembly sequence for automated disassembly process. Factors which affect the performances will be analysed and discussed. This paper is the proceeding research on the previous paper titled "Experimental Design for Reverse Assembly Based Disassembly Process". (C) 2015 The Authors. Published by ELsevier B.V.
引用
收藏
页码:191 / 195
页数:5
相关论文
共 50 条
  • [1] Process planning for product disassembly
    Das, SK
    Naik, S
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2002, 40 (06) : 1335 - 1355
  • [2] Analysis of an adaptive fuzzy system for disassembly process planning
    Turowski, M
    Tang, Y
    Morgan, M
    [J]. 2005 IEEE INTERNATIONAL SYMPOSIUM ON ELECTRONICS & THE ENVIRONMENT, CONFERENCE RECORD, 2005, : 249 - 254
  • [3] A genetic algorithm for disassembly process planning
    Kongar, E
    Gupta, SM
    [J]. ENVIRONMENTALLY CONSCIOUS MANUFACTURING II, 2002, 4569 : 54 - 62
  • [4] Usage mode and effects analysis to support disassembly process planning
    Perlewitz, H
    Müller, K
    Seliger, G
    [J]. INTELLIGENT ASSEMBLY AND DISASSEMBLY (IAD'98), 1998, : 11 - 16
  • [5] On disassembly workshop model integration for disassembly planning
    Addouche, S
    Perrard, C
    Henrioud, JM
    [J]. PROCEEDINGS OF THE 2003 IEEE INTERNATIONAL SYMPOSIUM ON ASSEMBLY AND TASK PLANNING (ISATP2003), 2003, : 157 - 162
  • [6] Disassembly sequence planning in a disassembly cell context
    Andres, Carlos
    Lozano, Sebastian
    Adenso-Diaz, B.
    [J]. ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2007, 23 (06) : 690 - 695
  • [7] Information Model for Cooperative Disassembly Process Planning
    Lee, Hanmin
    Park, Seongwhan
    Feng, Shaw C.
    [J]. COOPERATIVE DESIGN, VISUALIZATION, AND ENGINEERING (CDVE), 2011, 6874 : 121 - 124
  • [8] Adaptive fuzzy system for disassembly process planning
    Turowski, M
    Tang, Y
    [J]. 2005 IEEE Networking, Sensing and Control Proceedings, 2005, : 141 - 146
  • [9] DISASSEMBLY PROCESS PLANNING TRADEOFFS FOR PRODUCT MAINTENANCE
    Behdad, Sara
    Thurston, Deborah
    [J]. PROCEEDINGS OF THE ASME INTERNATIONAL DESIGN ENGINEERING TECHNICAL CONFERENCES AND COMPUTERS AND INFORMATION IN ENGINEERING CONFERENCE, DETC 2010, VOL 6, 2010, : 427 - 434
  • [10] Dynamic process and operation planning for hybrid disassembly
    Kim, H. -J.
    [J]. Innovation in Life Cycle Engineering and Sustainable Development, 2006, : 187 - 198