A genetic algorithm approach to a general category project scheduling problem

被引:115
|
作者
Özdamar, L [1 ]
机构
[1] Istanbul Kultur Univ, Dept Comp Engn, TR-80280 Istanbul, Turkey
关键词
genetic algorithms; heuristic knowledge; resource-constrained project scheduling;
D O I
10.1109/5326.740669
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
A genetic algorithm (GA) approach is proposed for the general resource constrained project scheduling model, in which activities may be executed in more than one operating mode and renewable as well as nonrenewable resource constraints exist, Each activity operation mode has a different duration and requires different amounts of renewable and nonrenewable resources. The objective is the minimization of the project duration or makespan, The problem under consideration is known to be one of the most difficult scheduling problems, and it is hard to find a feasible solution for such a problem, let alone the optimal one, The GA approach described here incorporates problem-specific scheduling knowledge by an indirect chromosome encoding that consists of selected activity operating modes and an ordered set of scheduling rules, The scheduling rules in the chromosome are used in an iterative scheduling algorithm that constructs the schedule resulting from the chromosome. The proposed GA is denoted as a hybrid GA (HGA) approach since it is integrated with traditional scheduling tools and expertise specifically developed for the general resource constrained project scheduling problem. The results demonstrate that HGA approach produces near-optimal solutions within a reasonable amount of computation time.
引用
收藏
页码:44 / 59
页数:16
相关论文
共 50 条
  • [41] Genetic Algorithm Parameters Tuning for Resource-constrained Project Scheduling Problem
    Tian, Xingke
    Yuan, Shengrui
    ADVANCES IN MATERIALS, MACHINERY, ELECTRONICS II, 2018, 1955
  • [42] Hybrid genetic algorithm for resource constrained multi-project scheduling problem
    Ying, Ying
    Shou, Yong-Yi
    Li, Min
    Zhejiang Daxue Xuebao (Gongxue Ban)/Journal of Zhejiang University (Engineering Science), 2009, 43 (01): : 23 - 27
  • [43] A genetic algorithm approach to the problem of factorization of general multidimensional polynomials
    Gonos, IF
    Mastorakis, NE
    Swamy, MNS
    IEEE TRANSACTIONS ON CIRCUITS AND SYSTEMS I-FUNDAMENTAL THEORY AND APPLICATIONS, 2003, 50 (01): : 16 - 22
  • [44] A genetic algorithm approach for solving a flexible job shop scheduling problem
    Department of Industrial Engineering, Faculty of Mechanical Engineering, 81310 Skudai, Johor Bahru, Malaysia
    Int. J. Comput. Sci. Issues, 1600, 3 (85-90):
  • [45] A modified genetic algorithm approach to flexible job shop scheduling problem
    Saidi-Mehrabad, M.
    Bagheri, M.
    2015 3RD INTERNATIONAL CONFERENCE ON MANUFACTURING ENGINEERING AND TECHNOLOGY FOR MANUFACTURING GROWTH (METMG 2015), 2015, : 138 - 142
  • [46] Genetic algorithm approach to earliness and tardiness production scheduling and planning problem
    Li, Y
    Ip, WH
    Wang, DW
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1998, 54 (01) : 65 - 76
  • [47] A GENETIC ALGORITHM FOR THE TALENT SCHEDULING PROBLEM
    NORDSTROM, AL
    TUFEKCI, S
    COMPUTERS & OPERATIONS RESEARCH, 1994, 21 (08) : 927 - 940
  • [48] A Genetic Algorithm Solution for Scheduling Problem
    Cortes Perez, Ernesto
    Montero Rios, Osiris
    Pacheco Bautista, Daniel
    Sanchez Sanchez, Sergio
    Aguilar Acevedo, Francisco
    2021 XVII INTERNATIONAL ENGINEERING CONGRESS (CONIIN), 2021,
  • [49] Genetic algorithm for logistics scheduling problem
    Wen, C
    Eberhart, RC
    CEC'02: PROCEEDINGS OF THE 2002 CONGRESS ON EVOLUTIONARY COMPUTATION, VOLS 1 AND 2, 2002, : 512 - 516
  • [50] A Genetic Algorithm for Solving Scheduling Problem
    Nazif, Habibeh
    JOURNAL OF MATHEMATICS AND COMPUTER SCIENCE-JMCS, 2012, 5 (02): : 91 - 96