A genetic algorithm approach to a general category project scheduling problem

被引:115
|
作者
Özdamar, L [1 ]
机构
[1] Istanbul Kultur Univ, Dept Comp Engn, TR-80280 Istanbul, Turkey
关键词
genetic algorithms; heuristic knowledge; resource-constrained project scheduling;
D O I
10.1109/5326.740669
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
A genetic algorithm (GA) approach is proposed for the general resource constrained project scheduling model, in which activities may be executed in more than one operating mode and renewable as well as nonrenewable resource constraints exist, Each activity operation mode has a different duration and requires different amounts of renewable and nonrenewable resources. The objective is the minimization of the project duration or makespan, The problem under consideration is known to be one of the most difficult scheduling problems, and it is hard to find a feasible solution for such a problem, let alone the optimal one, The GA approach described here incorporates problem-specific scheduling knowledge by an indirect chromosome encoding that consists of selected activity operating modes and an ordered set of scheduling rules, The scheduling rules in the chromosome are used in an iterative scheduling algorithm that constructs the schedule resulting from the chromosome. The proposed GA is denoted as a hybrid GA (HGA) approach since it is integrated with traditional scheduling tools and expertise specifically developed for the general resource constrained project scheduling problem. The results demonstrate that HGA approach produces near-optimal solutions within a reasonable amount of computation time.
引用
收藏
页码:44 / 59
页数:16
相关论文
共 50 条
  • [31] The distributed permutation flowshop scheduling problem: A genetic algorithm approach
    Li, Yan
    Chen, Zhigang
    PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON MECHATRONICS AND INDUSTRIAL INFORMATICS, 2015, 31 : 381 - 384
  • [32] Genetic algorithm constraint project scheduling
    Research and Decision Support System Dept., Faculty of Computers and Informatics, Zagazig University, Zagazig, Egypt
    不详
    AEJ Alexandria Eng J, 2006, 3 (289-298):
  • [33] Project Scheduling Based on Genetic Algorithm
    Ma, Ji
    2009 IEEE INTERNATIONAL CONFERENCE ON GRANULAR COMPUTING ( GRC 2009), 2009, : 434 - 439
  • [34] A simulation and genetic algorithm approach to stochastic research constrained project scheduling
    PetEdwards, J
    SOUTHCON/96 - CONFERENCE RECORD, 1996, : 333 - 338
  • [35] A random key based genetic algorithm for the resource constrained project scheduling problem
    Mendes, J. J. M.
    Goncalves, J. F.
    Resende, M. G. C.
    COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (01) : 92 - 109
  • [36] A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty
    Shadrokh, Shahram
    Kianfar, Fereydoon
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 181 (01) : 86 - 101
  • [37] Solving Resource-Constrained Project Scheduling Problem via Genetic Algorithm
    Liu, Jia
    Liu, Yisheng
    Shi, Ying
    Li, Jian
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2020, 34 (02)
  • [38] A Hybrid Genetic Algorithm for the Resource Constrained Multi-Project Scheduling Problem
    Li, Jinghua
    Liu, Wenjian
    ETFA 2005: 10TH IEEE INTERNATIONAL CONFERENCE ON EMERGING TECHNOLOGIES AND FACTORY AUTOMATION, VOL 2, PROCEEDINGS, 2005,
  • [39] A Genetic Algorithm with Neighborhood Search for the Resource-Constrained Project Scheduling Problem
    Proon, Sepehr
    Jin, Mingzhou
    NAVAL RESEARCH LOGISTICS, 2011, 58 (02) : 73 - 82
  • [40] A genetic algorithm for multi-mode resource constrained project scheduling problem
    Mori, M
    Tseng, CC
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 100 (01) : 134 - 141