A genetic algorithm approach to a general category project scheduling problem

被引:115
|
作者
Özdamar, L [1 ]
机构
[1] Istanbul Kultur Univ, Dept Comp Engn, TR-80280 Istanbul, Turkey
关键词
genetic algorithms; heuristic knowledge; resource-constrained project scheduling;
D O I
10.1109/5326.740669
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
A genetic algorithm (GA) approach is proposed for the general resource constrained project scheduling model, in which activities may be executed in more than one operating mode and renewable as well as nonrenewable resource constraints exist, Each activity operation mode has a different duration and requires different amounts of renewable and nonrenewable resources. The objective is the minimization of the project duration or makespan, The problem under consideration is known to be one of the most difficult scheduling problems, and it is hard to find a feasible solution for such a problem, let alone the optimal one, The GA approach described here incorporates problem-specific scheduling knowledge by an indirect chromosome encoding that consists of selected activity operating modes and an ordered set of scheduling rules, The scheduling rules in the chromosome are used in an iterative scheduling algorithm that constructs the schedule resulting from the chromosome. The proposed GA is denoted as a hybrid GA (HGA) approach since it is integrated with traditional scheduling tools and expertise specifically developed for the general resource constrained project scheduling problem. The results demonstrate that HGA approach produces near-optimal solutions within a reasonable amount of computation time.
引用
收藏
页码:44 / 59
页数:16
相关论文
共 50 条
  • [21] Solving Resource-Constrained Project Scheduling Problem by Genetic Algorithm
    Kadam, Sachin U.
    Kadam, Narendra S.
    2014 2ND INTERNATIONAL CONFERENCE ON BUSINESS AND INFORMATION MANAGEMENT (ICBIM), 2014,
  • [22] A hybrid genetic algorithm for the resource-constrained project scheduling problem
    Valls, Vicente
    Ballestin, Francisco
    Quintanilla, Sacramento
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 185 (02) : 495 - 508
  • [23] A new genetic algorithm for resource-constrained project scheduling problem
    Luo Ronggui
    Chen Xiaoming
    Huang Minmei
    PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON INNOVATION & MANAGEMENT, VOLS 1 AND 2, 2006, : 1595 - 1599
  • [24] Efficient Genetic Algorithm for Resource-Constrained Project Scheduling Problem
    王宏
    李同玲
    林丹
    Transactions of Tianjin University, 2010, 16 (05) : 376 - 382
  • [25] Efficient genetic algorithm for resource-constrained project scheduling problem
    Wang H.
    Li T.
    Lin D.
    Transactions of Tianjin University, 2010, 16 (5) : 376 - 382
  • [26] Robust Optimization Model of Project Scheduling Problem Based on Genetic Algorithm
    Wang, Dayong
    Li, Xiangyang
    Fang, Bingxiu
    Chou, Jinling
    PROCEEDINGS OF THE 2016 3RD INTERNATIONAL CONFERENCE ON MATERIALS ENGINEERING, MANUFACTURING TECHNOLOGY AND CONTROL, 2016, 67 : 1455 - 1461
  • [27] A Genetic Algorithm approach for solving a Job Shop Scheduling problem
    Anshulika
    Bewoor, L. A.
    2017 INTERNATIONAL CONFERENCE ON COMPUTER COMMUNICATION AND INFORMATICS (ICCCI), 2017,
  • [28] A genetic algorithm approach to the nurse scheduling problem with fuzzy preferences
    Duenas, Alejandra
    Tutuncu, G. Yazgi
    Chilcott, James B.
    IMA JOURNAL OF MANAGEMENT MATHEMATICS, 2009, 20 (04) : 369 - 383
  • [29] A genetic algorithm approach for surgery operating rooms scheduling problem
    Tsoy, G
    Arnaout, JP
    Smith, T
    Rabadi, G
    Managing in a Dangerous World: TWENTY-FIVE YEARS OF TECHNICAL CONFERENCES: BRIDGING BETWEEN TECHNOLOGY AND MANAGEMENT, 2004, : 299 - 304
  • [30] Genetic algorithm approach to a scheduling problem for a complex manufacturing system
    Sannomiya, N
    Iima, H
    Suzuki, K
    Kobayashi, Y
    LARGE SCALE SYSTEMS: THEORY AND APPLICATIONS 1998 (LSS'98), VOL 1, 1999, : 271 - 276