A Genetic Algorithm for Solving Scheduling Problem

被引:0
|
作者
Nazif, Habibeh [1 ]
机构
[1] Payame Noor Univ, Dept Math, Tehran, Iran
来源
关键词
genetic algorithm; single machine scheduling; completion time;
D O I
暂无
中图分类号
O1 [数学];
学科分类号
0701 ; 070101 ;
摘要
This paper considers a single machine family scheduling problem where jobs are partitioned into families and setup is required between these families. The objective is to find an optimal schedule that minimizes the total weighted completion time of the given jobs in the presence of the sequence independent family setup times. This problem has been proven to be strongly NP-hard. We introduce a genetic algorithm that employs an innovative crossover operator that utilizes an undirected bipartite graph to find the best offspring solution among an exponentially large number of potential offspring. Computational results are presented. The proposed algorithm is shown to be superior when compared with other local search methods namely the dynamic length tabu search and randomized steepest descent method.
引用
收藏
页码:91 / 96
页数:6
相关论文
共 50 条
  • [1] A genetic algorithm for solving the quay crane scheduling and allocation problem
    Olteanu, S.
    Costescu, D.
    Rusca, A.
    Oprea, C.
    [J]. MODTECH INTERNATIONAL CONFERENCE - MODERN TECHNOLOGIES IN INDUSTRIAL ENGINEERING VI (MODTECH 2018), 2018, 400
  • [2] A Genetic Algorithm approach for solving a Job Shop Scheduling problem
    Anshulika
    Bewoor, L. A.
    [J]. 2017 INTERNATIONAL CONFERENCE ON COMPUTER COMMUNICATION AND INFORMATICS (ICCCI), 2017,
  • [3] A genetic algorithm for solving the economic lot scheduling problem with reworks
    Chang, Yu-Jen
    Yao, Ming-Jong
    [J]. PROCEEDINGS OF THE EIGHTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2009, 8 : 294 - 306
  • [4] A genetic algorithm for solving economic lot size scheduling problem
    Sarker, R
    Newton, C
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2002, 42 (2-4) : 189 - 198
  • [5] Solving an Industrial Shop Scheduling Problem Using Genetic Algorithm
    Moghadam, Ali Mokhtari
    Wong, Kuan Yew
    Piroozfard, Hamed
    Asl, Ali Derakhshan
    Hutajulu, Tiurmai Shanty
    [J]. MATERIALS, INDUSTRIAL, AND MANUFACTURING ENGINEERING RESEARCH ADVANCES 1.1, 2014, 845 : 564 - 568
  • [6] Genetic Algorithm for Solving the Resource Constrained Project Scheduling Problem
    Alaa, Touihri
    Saoussen, Krichen
    Adel, Guitouni
    [J]. INTERNATIONAL JOURNAL OF APPLIED METAHEURISTIC COMPUTING, 2015, 6 (02) : 45 - 60
  • [7] Genetic Algorithm for Solving Job-Shop Scheduling Problem
    Li XiaoBo
    [J]. 2011 AASRI CONFERENCE ON INFORMATION TECHNOLOGY AND ECONOMIC DEVELOPMENT (AASRI-ITED 2011), VOL 1, 2011, : 296 - 298
  • [8] Genetic Algorithm for Solving Job-Shop Scheduling Problem
    Li XiaoBo
    [J]. 2011 INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS AND NEURAL COMPUTING (FSNC 2011), VOL IV, 2011, : 296 - 298
  • [9] A GENETIC ALGORITHM FOR SOLVING THE ECONOMIC LOT SCHEDULING PROBLEM WITH REWORKS
    Chang, Yu-Jen
    Yao, Ming-Jong
    [J]. JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2009, 26 (05) : 411 - 425
  • [10] The Crowding Mechanism Genetic Algorithm for Solving Job Scheduling Problem
    Wang, Zhurong
    Du, Mingfang
    Sun, Qindong
    Meng, Haining
    [J]. 2018 5TH INTERNATIONAL CONFERENCE ON SYSTEMS AND INFORMATICS (ICSAI), 2018, : 338 - 343