A GENETIC ALGORITHM FOR SOLVING THE ECONOMIC LOT SCHEDULING PROBLEM WITH REWORKS

被引:5
|
作者
Chang, Yu-Jen [1 ]
Yao, Ming-Jong [2 ]
机构
[1] Tunghai Univ, Dept Informat Management, Box 894,181 Taichung Kang Rd,Sect 3, Taichung, Taiwan
[2] Natl Chiao Tung Univ, Dept Transportat Technol & Management, Hsinchu 300, Taiwan
关键词
inventory; reworks; scheduling; genetic algorithm; economic lot;
D O I
10.1080/10170660909509155
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this study, we are interested in the economic lot scheduling problem (ELSP) with reworks in which the production system deals with two sources of products: manufacturing of the serviceable products and remanufacturing of the rework products. We may consider that these two categories of products compete for the same facility and they must be scheduled simultaneously. In this paper, we formulate a mathematical model for the ELSP with reworks using the common cycle (CC) approach in which only one manufacturing lot and only one rework lot for each product exist during a common cycle, and all the products share the same replenishment cycle. In order to solve this problem, we propose a hybrid genetic algorithm (GA) approach that obtains an optimal production sequence of all manufacturing and rework lots with the lowest average total cost. Our numerical examples demonstrate the effectiveness of the proposed hybrid GA.
引用
收藏
页码:411 / 425
页数:15
相关论文
共 50 条
  • [1] A genetic algorithm for solving the economic lot scheduling problem with reworks
    Chang, Yu-Jen
    Yao, Ming-Jong
    [J]. PROCEEDINGS OF THE EIGHTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2009, 8 : 294 - 306
  • [2] NEW HEURISTICS FOR SOLVING THE ECONOMIC LOT SCHEDULING PROBLEM WITH REWORKS
    Chang, Yu-Jen
    Yao, Ming-Jong
    [J]. JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2011, 7 (01) : 229 - 251
  • [3] A genetic algorithm for solving economic lot size scheduling problem
    Sarker, R
    Newton, C
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2002, 42 (2-4) : 189 - 198
  • [4] A genetic algorithm for solving the economic lot scheduling problem in flow shops
    Huang, Jia-Yen
    Yao, Ming-Jong
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (14) : 3737 - 3761
  • [5] A HYBRID GENETIC ALGORITHM FOR SOLVING THE ECONOMIC LOT SCHEDULING PROBLEM (ELSP)
    Qiu, Xuan
    Chang, Hui-You
    [J]. PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-6, 2009, : 1315 - 1320
  • [6] A genetic algorithm for solving a fuzzy economic lot-size scheduling problem
    Chang, PT
    Yao, MJ
    Huang, SF
    Chen, CT
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2006, 102 (02) : 265 - 288
  • [7] Observation on: A genetic algorithm for solving a fuzzy economic lot-size scheduling problem
    Goyal, S. K.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2007, 105 (02) : 608 - 608
  • [8] A tabu search algorithm for solving economic lot scheduling problem
    Raza, S. A.
    Akgunduz, A.
    Chen, M. Y.
    [J]. JOURNAL OF HEURISTICS, 2006, 12 (06) : 413 - 426
  • [9] A tabu search algorithm for solving economic lot scheduling problem
    S. A. Raza
    A. Akgunduz
    M. Y. Chen
    [J]. Journal of Heuristics, 2006, 12
  • [10] A Genetic Algorithm for Solving the Economic Lot and Inspection Scheduling Problem in an Imperfect Production/Inventory System
    Chen, Shih-Chieh
    Yao, Ming-Jong
    Chang, Yu-Jen
    [J]. PROCEEDINGS OF THE EIGHTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2009, 8 : 345 - 350