NEW HEURISTICS FOR SOLVING THE ECONOMIC LOT SCHEDULING PROBLEM WITH REWORKS

被引:4
|
作者
Chang, Yu-Jen [1 ]
Yao, Ming-Jong [2 ]
机构
[1] Tunghai Univ, Dept Informat Management, Taichung 40704, Taiwan
[2] Natl Chiao Tung Univ, Dept Transportat Technol & Management, Hsinchu, Taiwan
关键词
Inventory; rework; logistics; heuristic; scheduling; search; WASTE-DISPOSAL MODEL; PRODUCTION SYSTEM; EOQ REPAIR; RETURNS; PRODUCTS; MACHINE; SINGLE; YIELD; SCRAP; CYCLE;
D O I
10.3934/jimo.2011.7.229
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this study, we are interested in the economic lot scheduling problem (ELSP) that considers manufacturing of the serviceable products and remanufacturing of the rework products. In this paper, we formulate a mathematical model for the ELSP with reworks using the common cycle approach in which only one manufacturing lot and only one rework lot for each product exist during a common cycle. In order to solve this problem, we propose two heuristics that not only search for the optimal cycle time and an optimal production sequence, but also utilize a simple scheduling heuristic to schedule the starting time of all the manufacturing and rework lots so as to minimize the average total costs. The first heuristic is a simple heuristic that employs a 2-opt search to obtain a close-to-optimal production sequence. The second heuristic, which is a refined version of the simple heuristic, employs a bisection search to look for an optimal cycle time. In our numerical experiments, we compare the effectiveness of both heuristics using randomly generated instances.
引用
收藏
页码:229 / 251
页数:23
相关论文
共 50 条
  • [1] A genetic algorithm for solving the economic lot scheduling problem with reworks
    Chang, Yu-Jen
    Yao, Ming-Jong
    [J]. PROCEEDINGS OF THE EIGHTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2009, 8 : 294 - 306
  • [2] A GENETIC ALGORITHM FOR SOLVING THE ECONOMIC LOT SCHEDULING PROBLEM WITH REWORKS
    Chang, Yu-Jen
    Yao, Ming-Jong
    [J]. JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2009, 26 (05) : 411 - 425
  • [3] Heuristics for the economic lot scheduling problem with returns
    Teunter, Ruud
    Tang, Ou
    Kaparis, Konstantinos
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 118 (01) : 323 - 330
  • [4] Comparison of heuristics for an economic lot scheduling problem with deliberated coproduction
    Vidal-Carreras, Pilar I.
    Garcia-Sabater, Jose P.
    [J]. JOURNAL OF INDUSTRIAL ENGINEERING AND MANAGEMENT-JIEM, 2009, 2 (03): : 437 - 463
  • [5] The use of meta-heuristics to solve economic lot scheduling problem
    Raza, SA
    Akgunduz, A
    [J]. EVOLUTIONARY COMPUTATION IN COMBINATORIAL OPTIMIZATION, PROCEEDINGS, 2005, 3448 : 190 - 201
  • [6] 2 HEURISTICS FOR THE ECONOMIC LOT SCHEDULING PROBLEM - AN EXPERIMENTAL-STUDY
    GENG, PC
    VICKSON, RG
    [J]. NAVAL RESEARCH LOGISTICS, 1988, 35 (04) : 605 - 617
  • [7] A tabu search algorithm for solving economic lot scheduling problem
    Raza, S. A.
    Akgunduz, A.
    Chen, M. Y.
    [J]. JOURNAL OF HEURISTICS, 2006, 12 (06) : 413 - 426
  • [8] A genetic algorithm for solving economic lot size scheduling problem
    Sarker, R
    Newton, C
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2002, 42 (2-4) : 189 - 198
  • [9] A tabu search algorithm for solving economic lot scheduling problem
    S. A. Raza
    A. Akgunduz
    M. Y. Chen
    [J]. Journal of Heuristics, 2006, 12
  • [10] New Algorithm for Economic Lot Scheduling Problem
    Luo, Rongwu
    [J]. PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON LOGISTICS SYSTEMS AND INTELLIGENT MANAGEMENT, VOLS 1-3, 2010, : 334 - 337