共 50 条
- [31] WHEN IS THE ECONOMIC LOT SCHEDULING PROBLEM EASY [J]. IIE TRANSACTIONS, 1989, 21 (01) : 11 - 20
- [32] A Economic Lot Scheduling Problem for Manufacturing and remanufacturing [J]. 2008 IEEE CONFERENCE ON CYBERNETICS AND INTELLIGENT SYSTEMS, VOLS 1 AND 2, 2008, : 839 - 843
- [33] A COMPUTATIONAL APPROACH TO THE ECONOMIC LOT SCHEDULING PROBLEM [J]. MANAGEMENT SCIENCE, 1958, 4 (03) : 264 - 291
- [35] Solving the economic lot scheduling problem with multiple facilities in parallel using the time-varying lot sizes approach [J]. PROCEEDINGS OF THE EIGHTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2009, 8 : 601 - 612
- [36] Solving the economic lot scheduling problem with multiple facilities in parallel using the time-varying lot sizes approach [J]. JOURNAL OF INFORMATION & OPTIMIZATION SCIENCES, 2010, 31 (04): : 809 - 835
- [37] A Genetic Algorithm for Solving the Economic Lot and Inspection Scheduling Problem in an Imperfect Production/Inventory System [J]. PROCEEDINGS OF THE EIGHTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2009, 8 : 345 - 350
- [39] New Heuristics to Stochastic Dynamic Lot Sizing Problem [J]. GAZI UNIVERSITY JOURNAL OF SCIENCE, 2009, 22 (02): : 97 - 106
- [40] New heuristics to stochastic dynamic lot sizing problem [J]. G.U. Journal of Science, 2009, 22 (02): : 97 - 106