SIMULATION-BASED APPROACH TO SYSTEMATIC PROJECT PLANNING AND SCHEDULING AT A BRIDGE GIRDER FABRICATION SHOP

被引:0
|
作者
Hasan, Monjuml [1 ]
Lu, Ming [1 ]
Ritcey, Chris [2 ]
机构
[1] Univ Alberta, Dept Civil & Environm Engn, 7-203 DICE,9211-116 St NW, Edmonton, AB T6G 1H9, Canada
[2] Supreme Steel Bridge Div, 10496 21 St NW, Edmonton, AB T6P 1W4, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
CONSTRUCTION;
D O I
暂无
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
This paper addresses a practical planning problem in bridge steel girder fabrication in an attempt to illuminate why the identified problem does not lend it well to existing solutions for construction planning. A simulation-based approach is presented for project scheduling and production planning at a structural steel fabrication shop. The shop simultaneously produces girders for various clients in construction of multiple bridges. Particular emphasis is placed on how to interpret and represent simulation outputs in terms of customized schedules of various details so as to cater to the needs of different stakeholders involved at multiple management levels. The applicability of the proposed approach is demonstrated with a case study based on real-world settings.
引用
收藏
页码:2935 / 2946
页数:12
相关论文
共 50 条
  • [1] A Simulation-based Approach to Job Shop Scheduling with Bottlenecks
    Zhang, Rui
    Wu, Cheng
    2008 6TH IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL INFORMATICS, VOLS 1-3, 2008, : 969 - 974
  • [2] Hybrid approach using simulation-based optimisation for job shop scheduling problems
    Kulkarni, K.
    Venkateswaran, J.
    JOURNAL OF SIMULATION, 2015, 9 (04) : 312 - 324
  • [3] A simulation-based genetic algorithm approach for remanufacturing process planning and scheduling
    Zhang, Rui
    Ong, S. K.
    Nee, A. Y. C.
    APPLIED SOFT COMPUTING, 2015, 37 : 521 - 532
  • [4] Database driven simulation/simulation-based scheduling of a job-shop
    Koh, Kwang-Hang
    de Souza, Robert
    Ho, Nai-Choon
    Simulation Practice and Theory, 1996, 4 (01): : 31 - 45
  • [5] Simulation-Based Network Maintenance Planning and Scheduling
    Wang, Shiaau-Lir
    Yang, Ning
    Schonfeld, Paul
    TRANSPORTATION RESEARCH RECORD, 2009, (2100) : 94 - 102
  • [6] Design and Validation of a Simulation-based Modular Planning and Scheduling System of Semiconductor Fabrication Facilities
    Li Li
    Qiao Fei
    MEASURING TECHNOLOGY AND MECHATRONICS AUTOMATION, PTS 1 AND 2, 2011, 48-49 : 378 - 381
  • [7] IPA - A SIMULATION-BASED EXPERT SYSTEM FOR SHOP FLOOR SCHEDULING
    SARIDERELI, SO
    LEININGER, G
    CHANG, WC
    EXPERT SYSTEMS AND THE LEADING EDGE IN PRODUCTION AND OPERATIONS MANAGEMENT: PROCEEDINGS OF THE THIRD INTERNATIONAL CONFERENCE, 1989, : 425 - 432
  • [8] SIMULATION-BASED ONLINE SCHEDULING IN A MAKE-TO-ORDER JOB SHOP
    Krige, D.
    Bekker, J.
    Schutte, C.
    SOUTH AFRICAN JOURNAL OF INDUSTRIAL ENGINEERING, 2009, 20 (02): : 205 - 217
  • [9] SIMULATION-BASED OPTIMIZATION FOR SOLVING A HYBRID FLOW SHOP SCHEDULING PROBLEM
    Aurich, Paul
    Nahhas, Abdulrahman
    Reggelin, Tobias
    Tolujew, Juri
    2016 WINTER SIMULATION CONFERENCE (WSC), 2016, : 2809 - 2819
  • [10] SIMULATION-BASED SCHEDULING AND MANAGEMENT INFORMATION-SYSTEM FOR A MACHINE SHOP
    JAIN, SK
    INTERFACES, 1975, 6 (01) : 81 - 96