Design and Validation of a Simulation-based Modular Planning and Scheduling System of Semiconductor Fabrication Facilities

被引:1
|
作者
Li Li [1 ]
Qiao Fei [1 ]
机构
[1] Tongji Univ, Sch Elect & Informat Engn, Shanghai 201804, Peoples R China
关键词
scheduling; planning; simulation; semiconductor manufacturing;
D O I
10.4028/www.scientific.net/AMM.48-49.378
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
A simulation-based modular planning and scheduling system developed for semiconductor fabrication facilities (SFFs) is discussed. Firstly, the general structure model (GSM) for SFFs, composed of a configurable definition layer, a physical layer, a process information layer and a planning and scheduling layer, is proposed. Secondly, a data-based dynamic simulation modeling method is given. Thirdly, a simulation-based modular planning and scheduling system (SMPSS) for SFFs, including model modules, release control modules, scheduling modules and rescheduling modules, is designed and developed. Finally, a case study is used to demonstrate the effectiveness of SMPSS.
引用
收藏
页码:378 / 381
页数:4
相关论文
共 50 条
  • [1] Design and validation of heuristic algorithms for simulation-based scheduling of a semiconductor Backend facility
    Weigert, G.
    Klemmt, A.
    Horn, S.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2009, 47 (08) : 2165 - 2184
  • [2] Simulation-based scheduling: Meeting the semiconductor wafer fabrication challenge
    Thompson, M
    IIE SOLUTIONS, 1996, 28 (05): : 30 - 34
  • [3] PARALLEL SIMULATION-BASED OPTIMIZATION ON SCHEDULING OF A SEMICONDUCTOR MANUFACTURING SYSTEM
    Ma, Yumin
    Qiao, Fei
    Yu, Wei
    Lu, Jianfeng
    PROCEEDINGS OF THE 2014 WINTER SIMULATION CONFERENCE (WSC), 2014, : 2571 - 2579
  • [4] Simulation-based optimization of dispatching rules for semiconductor wafer fabrication system scheduling by the response surface methodology
    Zhang, Huai
    Jiang, Zhibin
    Guo, Chengtao
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 41 (1-2): : 110 - 121
  • [5] Simulation-based optimization of dispatching rules for semiconductor wafer fabrication system scheduling by the response surface methodology
    Huai Zhang
    Zhibin Jiang
    Chengtao Guo
    The International Journal of Advanced Manufacturing Technology, 2009, 41 : 110 - 121
  • [6] Using workflow for reconfigurable simulation-based planning and scheduling system
    Lee, Ho Yeoul
    Choi, Byoung Kyu
    INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2011, 24 (02) : 171 - 187
  • [7] A Modular Simulation System for Semiconductor Manufacturing Scheduling
    Li, Li
    Qiao, Fei
    PRZEGLAD ELEKTROTECHNICZNY, 2012, 88 (1B): : 12 - 18
  • [8] Simulation-Based Network Maintenance Planning and Scheduling
    Wang, Shiaau-Lir
    Yang, Ning
    Schonfeld, Paul
    TRANSPORTATION RESEARCH RECORD, 2009, (2100) : 94 - 102
  • [9] Simulation-Based Multiagent Approach for Scheduling Modular Construction
    Taghaddos, Hosein
    Hermann, Ulrich
    AbouRizk, Simaan
    Mohamed, Yasser
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2014, 28 (02) : 263 - 274
  • [10] SIMULATION-BASED APPROACH TO SYSTEMATIC PROJECT PLANNING AND SCHEDULING AT A BRIDGE GIRDER FABRICATION SHOP
    Hasan, Monjuml
    Lu, Ming
    Ritcey, Chris
    2019 WINTER SIMULATION CONFERENCE (WSC), 2019, : 2935 - 2946