Design and Validation of a Simulation-based Modular Planning and Scheduling System of Semiconductor Fabrication Facilities

被引:1
|
作者
Li Li [1 ]
Qiao Fei [1 ]
机构
[1] Tongji Univ, Sch Elect & Informat Engn, Shanghai 201804, Peoples R China
关键词
scheduling; planning; simulation; semiconductor manufacturing;
D O I
10.4028/www.scientific.net/AMM.48-49.378
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
A simulation-based modular planning and scheduling system developed for semiconductor fabrication facilities (SFFs) is discussed. Firstly, the general structure model (GSM) for SFFs, composed of a configurable definition layer, a physical layer, a process information layer and a planning and scheduling layer, is proposed. Secondly, a data-based dynamic simulation modeling method is given. Thirdly, a simulation-based modular planning and scheduling system (SMPSS) for SFFs, including model modules, release control modules, scheduling modules and rescheduling modules, is designed and developed. Finally, a case study is used to demonstrate the effectiveness of SMPSS.
引用
收藏
页码:378 / 381
页数:4
相关论文
共 50 条
  • [41] ARCHITECTURE FOR SIMULATION-BASED PERFORMANCE ASSESSMENT OF PLANNING APPROACHES IN SEMICONDUCTOR MANUFACTURING
    Ponsignon, Thomas
    Moench, Lars
    PROCEEDINGS OF THE 2010 WINTER SIMULATION CONFERENCE, 2010, : 3341 - 3349
  • [42] Perspectives of OR management:: from process analysis to simulation-based planning and scheduling
    Denz, C.
    Baumgart, A.
    Zoeller, A.
    Schleppers, A.
    Heinzl, A.
    Bender, H. -J.
    ANASTHESIOLOGIE & INTENSIVMEDIZIN, 2008, 49 : 85 - 93
  • [43] A simulation-based genetic algorithm approach for remanufacturing process planning and scheduling
    Zhang, Rui
    Ong, S. K.
    Nee, A. Y. C.
    APPLIED SOFT COMPUTING, 2015, 37 : 521 - 532
  • [44] A SIMULATION-BASED PLANNING SYSTEM FOR WIND TURBINE CONSTRUCTION
    Atef, Dina
    Osman, Hesham
    Ibrahim, Moheeb
    Nassar, Khaled
    PROCEEDINGS OF THE 2010 WINTER SIMULATION CONFERENCE, 2010, : 3283 - 3294
  • [45] Using simulation-based scheduling to maximize demand fulfillment in a semiconductor assembly facility
    Potoradi, J
    Boon, OS
    Mason, SJ
    Fowler, JW
    Pfund, ME
    PROCEEDINGS OF THE 2002 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2002, : 1857 - 1861
  • [46] A problem reduction approach for scheduling semiconductor wafer fabrication facilities
    Upasani, Abhijit A.
    Uzsoy, Reha
    Sourirajan, Karthik
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2006, 19 (02) : 216 - 225
  • [47] SIMULATION-BASED SUSTAINABLE MANUFACTURING SYSTEM DESIGN
    Heilala, Juhani
    Vatanen, Saija
    Tonteri, Hannele
    Montonen, Jari
    Lind, Salla
    Johansson, Bjorn
    Stahre, Johan
    2008 WINTER SIMULATION CONFERENCE, VOLS 1-5, 2008, : 1922 - +
  • [48] Multi-agent-based dynamic scheduling method for semiconductor wafer fabrication facilities
    College of Electronics and Information Engineering, Tongji University, Shanghai 200092, China
    Qinghua Daxue Xuebao, 2007, SUPPL. 2 (1895-1898):
  • [49] Simulation based scheduling system in a semiconductor backend facility
    Werner, Sebastian
    Horn, Sven
    Weigert, Gerald
    Jaehnig, Thomas
    PROCEEDINGS OF THE 2006 WINTER SIMULATION CONFERENCE, VOLS 1-5, 2006, : 1741 - +
  • [50] Intelligent simulation-based lot scheduling of photolithography toolsets in a wafer fabrication facility
    Arisha, A
    Young, P
    PROCEEDINGS OF THE 2004 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2004, : 1935 - 1942