SIMULATION-BASED APPROACH TO SYSTEMATIC PROJECT PLANNING AND SCHEDULING AT A BRIDGE GIRDER FABRICATION SHOP

被引:0
|
作者
Hasan, Monjuml [1 ]
Lu, Ming [1 ]
Ritcey, Chris [2 ]
机构
[1] Univ Alberta, Dept Civil & Environm Engn, 7-203 DICE,9211-116 St NW, Edmonton, AB T6G 1H9, Canada
[2] Supreme Steel Bridge Div, 10496 21 St NW, Edmonton, AB T6P 1W4, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
CONSTRUCTION;
D O I
暂无
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
This paper addresses a practical planning problem in bridge steel girder fabrication in an attempt to illuminate why the identified problem does not lend it well to existing solutions for construction planning. A simulation-based approach is presented for project scheduling and production planning at a structural steel fabrication shop. The shop simultaneously produces girders for various clients in construction of multiple bridges. Particular emphasis is placed on how to interpret and represent simulation outputs in terms of customized schedules of various details so as to cater to the needs of different stakeholders involved at multiple management levels. The applicability of the proposed approach is demonstrated with a case study based on real-world settings.
引用
收藏
页码:2935 / 2946
页数:12
相关论文
共 50 条
  • [41] SIMULATION-BASED APPROACH FOR MULTIPROJECT SCHEDULING BASED ON COMPOSITE PRIORITY RULES
    Alvarez-Campana, P.
    Villafanez, F.
    Acebes, F.
    Poza, D.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2024, 23 (01) : 29 - 40
  • [42] A systematic approach for simulation-based dimensioning of production systems during the concept phase of factory planning
    Schaefer, Louis
    Klenk, Felix
    Maier, Tanja
    Zehner, Marie
    Peukert, Sina
    Linzbach, Roman
    Treiber, Tilman
    Lanza, Gisela
    PRODUCTION ENGINEERING-RESEARCH AND DEVELOPMENT, 2024, 18 (05): : 813 - 825
  • [43] A Simulation-Based Metaheuristic Approach to Integrated Scheduling of Seedling Production
    Feng, Jingyuan
    Hu, Xiangpei
    Kong, Nan
    IEEE ROBOTICS AND AUTOMATION LETTERS, 2022, 7 (02) : 1792 - 1799
  • [44] A Simulation-Based Optimization Approach to the Firefighting Resource Scheduling Problem
    Paiva, Emerson J.
    Matos, Marina A.
    Rocha, Ana Maria A. C.
    COMPUTATIONAL SCIENCE AND ITS APPLICATIONS-ICCSA 2024 WORKSHOPS, PT II, 2024, 14816 : 383 - 396
  • [45] The parcel hub scheduling problem: A simulation-based solution approach
    McWilliams, DL
    Stanfield, PM
    Geiger, CD
    COMPUTERS & INDUSTRIAL ENGINEERING, 2005, 49 (03) : 393 - 412
  • [46] Intelligent simulation-based lot scheduling of photolithography toolsets in a wafer fabrication facility
    Arisha, A
    Young, P
    PROCEEDINGS OF THE 2004 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2004, : 1935 - 1942
  • [47] Generating labour cost budget for a construction-oriented fabrication facility: simulation-based resource scheduling approach
    Zahedi, Leila
    Lu, Ming
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2022, 49 (06) : 1069 - 1084
  • [48] SIBS - A JOB SHOP SIMULATION-BASED SCHEDULER
    DAREL, EM
    FEUER, Z
    COMPUTER INTEGRATED MANUFACTURING SYSTEMS, 1992, 5 (01): : 15 - 20
  • [49] A simulation-based backward planning approach for order-release
    Watson, EF
    Medeiros, DJ
    Sadowski, RP
    PROCEEDINGS OF THE 1997 WINTER SIMULATION CONFERENCE, 1997, : 765 - 772
  • [50] A simulation-based approach for plant layout design and production planning
    Zhang, Zhinan
    Wang, Xin
    Wang, Xiaohan
    Cui, Fan
    Cheng, Hui
    JOURNAL OF AMBIENT INTELLIGENCE AND HUMANIZED COMPUTING, 2019, 10 (03) : 1217 - 1230