摘要
This paper addresses a practical planning problem in bridge steel girder fabrication in an attempt to illuminate why the identified problem does not lend it well to existing solutions for construction planning. A simulation-based approach is presented for project scheduling and production planning at a structural steel fabrication shop. The shop simultaneously produces girders for various clients in construction of multiple bridges. Particular emphasis is placed on how to interpret and represent simulation outputs in terms of customized schedules of various details so as to cater to the needs of different stakeholders involved at multiple management levels. The applicability of the proposed approach is demonstrated with a case study based on real-world settings.
引用
收藏
页码:2935 / 2946
页数:12
相关论文
共 50 条
  • [21] Simulation-based machine shop operations scheduling system for energy cost reduction
    Kim, Sojung
    Meng, Chao
    Son, Young Jun
    SIMULATION MODELLING PRACTICE AND THEORY, 2017, 77 : 68 - 83
  • [22] Experimental investigation of iterative simulation-based scheduling in a dynamic and stochastic job shop
    Kutanoglu, E
    Sabuncuoglu, I
    JOURNAL OF MANUFACTURING SYSTEMS, 2001, 20 (04) : 264 - 279
  • [23] Simulation-based Solution for Multi-crane Dynamic Scheduling in Steelmaking Shop
    Li J.
    Xu A.-J.
    Dongbei Daxue Xuebao/Journal of Northeastern University, 2020, 41 (12): : 1699 - 1707
  • [24] Simulation-Based Multiagent Approach for Scheduling Modular Construction
    Taghaddos, Hosein
    Hermann, Ulrich
    AbouRizk, Simaan
    Mohamed, Yasser
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2014, 28 (02) : 263 - 274
  • [25] An evolutionary simulation-based optimization approach for dispatching scheduling
    Korytkowski, Przemyslaw
    Wisniewski, Tomasz
    Rymaszewski, Szymon
    SIMULATION MODELLING PRACTICE AND THEORY, 2013, 35 : 69 - 85
  • [26] Trade-off between time and cost in project planning: a simulation-based optimization approach
    Senses, Sena
    Kumral, Mustafa
    SIMULATION-TRANSACTIONS OF THE SOCIETY FOR MODELING AND SIMULATION INTERNATIONAL, 2024, 100 (02): : 127 - 143
  • [27] Integrated development of nonlinear process planning and simulation-based shop floor control
    Kim, SB
    Woo, JY
    Park, SS
    Jung, BW
    Cho, HB
    PROCEEDINGS OF THE 2002 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2002, : 1465 - 1468
  • [28] Simulation-based shop floor control
    Son, YJ
    Joshi, SB
    Wysk, RA
    Smith, JS
    JOURNAL OF MANUFACTURING SYSTEMS, 2002, 21 (05) : 380 - 394
  • [29] Simulation and Optimisation Based Approach for Job Shop Scheduling Problems
    Kulkarni, Pooja
    Venkateswaran, Jayendran
    2016 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2016, : 360 - 364
  • [30] A Scenario Approach to Robust Simulation-based Path Planning
    Bopardikar, Shaunak D.
    Srivastava, Vaibhav
    2022 AMERICAN CONTROL CONFERENCE, ACC, 2022, : 5024 - 5029