SIMULATION-BASED APPROACH TO SYSTEMATIC PROJECT PLANNING AND SCHEDULING AT A BRIDGE GIRDER FABRICATION SHOP

被引:0
|
作者
Hasan, Monjuml [1 ]
Lu, Ming [1 ]
Ritcey, Chris [2 ]
机构
[1] Univ Alberta, Dept Civil & Environm Engn, 7-203 DICE,9211-116 St NW, Edmonton, AB T6G 1H9, Canada
[2] Supreme Steel Bridge Div, 10496 21 St NW, Edmonton, AB T6P 1W4, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
CONSTRUCTION;
D O I
暂无
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
This paper addresses a practical planning problem in bridge steel girder fabrication in an attempt to illuminate why the identified problem does not lend it well to existing solutions for construction planning. A simulation-based approach is presented for project scheduling and production planning at a structural steel fabrication shop. The shop simultaneously produces girders for various clients in construction of multiple bridges. Particular emphasis is placed on how to interpret and represent simulation outputs in terms of customized schedules of various details so as to cater to the needs of different stakeholders involved at multiple management levels. The applicability of the proposed approach is demonstrated with a case study based on real-world settings.
引用
收藏
页码:2935 / 2946
页数:12
相关论文
共 50 条
  • [31] Production Planning in the Aquaculture Industry: A Simulation-based Approach
    Bellos, Evangelos
    Leopoulos, Vrassidas
    Menicou, Michalis
    Charalambides, Marios
    EUROPEAN SIMULATION AND MODELLING CONFERENCE 2010, 2010, : 443 - +
  • [32] A simulation-based approach for material yard laydown planning
    Alanjari, Pejman
    Razavialavi, Seyedreza
    AbouRizk, Simaan
    AUTOMATION IN CONSTRUCTION, 2014, 40 : 1 - 8
  • [33] A novel integrated condition-based maintenance and stochastic flexible job shop scheduling problem: simulation-based optimization approach
    Seyed Habib A. Rahmati
    Abbas Ahmadi
    Kannan Govindan
    Annals of Operations Research, 2018, 269 : 583 - 621
  • [34] A Simulation-Based Dynamic Scheduling Method in Project Cost Estimation Process
    Ishii, Nobuaki
    Takano, Yuichi
    Muraki, Masaaki
    SIMULATION AND MODELING METHODOLOGIES, TECHNOLOGIES AND APPLICATIONS, SIMULTECH 2016, 2018, 676 : 261 - 279
  • [35] A novel integrated condition-based maintenance and stochastic flexible job shop scheduling problem: simulation-based optimization approach
    Rahmati, Seyed Habib A.
    Ahmadi, Abbas
    Govindan, Kannan
    ANNALS OF OPERATIONS RESEARCH, 2018, 269 (1-2) : 583 - 621
  • [36] Simulation-based solution for a dynamic multi-crane-scheduling problem in a steelmaking shop
    Li, Ji
    Xu, Anjun
    Zang, Xuesong
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2020, 58 (22) : 6970 - 6984
  • [37] Simulation-based optimal sensor scheduling with application to observer trajectory planning
    Singh, Sumeetpal S.
    Kantas, Nikolaos
    Vo, Ba-Ngu
    Doucet, Arnaud
    Evans, Robin J.
    AUTOMATICA, 2007, 43 (05) : 817 - 830
  • [38] Simulation-based optimal sensor scheduling with application to observer trajectory planning
    Singh, Sumeetpal
    Kantas, Nikolas
    Vo, Ba-Ngu
    Doucet, Arnaud
    Evans, Robin J.
    2005 44TH IEEE CONFERENCE ON DECISION AND CONTROL & EUROPEAN CONTROL CONFERENCE, VOLS 1-8, 2005, : 7296 - 7301
  • [39] Perspectives of OR management:: from process analysis to simulation-based planning and scheduling
    Denz, C.
    Baumgart, A.
    Zoeller, A.
    Schleppers, A.
    Heinzl, A.
    Bender, H. -J.
    ANASTHESIOLOGIE & INTENSIVMEDIZIN, 2008, 49 : 85 - 93
  • [40] A MULTI-LEVEL MODELING APPROACH FOR SIMULATION-BASED CAPACITY PLANNING AND SCHEDULING OF AIRCRAFT MAINTENANCE PROJECTS
    Fabig, Christian
    Winter, Elias
    2018 WINTER SIMULATION CONFERENCE (WSC), 2018, : 3252 - 3263