Heuristics for the exam scheduling problem

被引:1
|
作者
Fu, ZH [1 ]
Lim, A [1 ]
机构
[1] Natl Univ Singapore, Dept Comp Sci, Singapore 117543, Singapore
关键词
D O I
10.1109/TAI.2000.889864
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
As part of the process of creating a campus-wide timetabling system for the National University of Singapore, the authors investigated examination scheduling algorithms. The challenge in exam scheduling is to draw up the final examination timetable, taking into account a number of different constraints. The authors propose a different approach when the inter-examination gaps (termed paper spread) of each student should be maximized. The results compare favorably against the actual timetable produced by the current manual system.
引用
收藏
页码:172 / 175
页数:4
相关论文
共 50 条
  • [21] NEW HEURISTICS FOR SOLVING THE ECONOMIC LOT SCHEDULING PROBLEM WITH REWORKS
    Chang, Yu-Jen
    Yao, Ming-Jong
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2011, 7 (01) : 229 - 251
  • [22] Heuristics for the local grid scheduling problem with processing time constraints
    Lucio Grandinetti
    Francesca Guerriero
    Luigi Di Puglia Pugliese
    Mehdi Sheikhalishahi
    Journal of Heuristics, 2015, 21 : 523 - 547
  • [23] Heuristics for assembly operation scheduling problem in flexible assembly systems
    Jeong, Bongju
    Sim, Seung-Bae
    Jung, Hosang
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 29 (9-10): : 1033 - 1040
  • [24] Exact Methods and Heuristics for the Liner Shipping Crew Scheduling Problem
    Sereno, Valerio Maria
    Reinhardt, Line Blander
    Guericke, Stefan
    COMPUTATIONAL LOGISTICS (ICCL 2018), 2018, 11184 : 363 - 378
  • [25] Comparison of heuristics for an economic lot scheduling problem with deliberated coproduction
    Vidal-Carreras, Pilar I.
    Garcia-Sabater, Jose P.
    JOURNAL OF INDUSTRIAL ENGINEERING AND MANAGEMENT-JIEM, 2009, 2 (03): : 437 - 463
  • [26] Solving a bus driver scheduling problem with randomized multistart heuristics
    De Leone, Renato
    Festa, Paola
    Marchitto, Emilia
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2011, 18 (06) : 707 - 727
  • [27] Dynamic heuristics for the generalized job-shop scheduling problem
    Ghedjati, Fatima
    Portmann, Marie-Claude
    2009 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN AND CYBERNETICS (SMC 2009), VOLS 1-9, 2009, : 2562 - +
  • [28] Solving the Software Project Scheduling Problem with Hyper-heuristics
    de Andrade, Joaquim
    Silva, Leila
    Britto, Andre
    Amaral, Rodrigo
    ARTIFICIAL INTELLIGENCEAND SOFT COMPUTING, PT I, 2019, 11508 : 399 - 411
  • [29] Heuristics for assembly operation scheduling problem in flexible assembly systems
    Bongju Jeong
    Seung-Bae Sim
    Hosang Jung
    The International Journal of Advanced Manufacturing Technology, 2006, 29 : 1033 - 1040
  • [30] Heuristics for the local grid scheduling problem with processing time constraints
    Grandinetti, Lucio
    Guerriero, Francesca
    Pugliese, Luigi Di Puglia
    Sheikhalishahi, Mehdi
    JOURNAL OF HEURISTICS, 2015, 21 (04) : 523 - 547