共 50 条
- [41] Heuristics in Permutation GOMEA for Solving the Permutation Flowshop Scheduling Problem PARALLEL PROBLEM SOLVING FROM NATURE - PPSN XV, PT I, 2018, 11101 : 146 - 157
- [44] Heuristics to maximize system availability on parallel machine scheduling Problem 2015 12th IEEE International Conference on Programming and Systems (ISPS), 2015, : 264 - 269
- [47] The use of meta-heuristics to solve economic lot scheduling problem EVOLUTIONARY COMPUTATION IN COMBINATORIAL OPTIMIZATION, PROCEEDINGS, 2005, 3448 : 190 - 201
- [49] Heuristics for a Distributed Parallel Machine Assembly Scheduling Problem with Eligibility Constraints 2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM), 2015, : 145 - 153
- [50] Heuristics and Constraint Programming hybridizations for a real pipeline planning and scheduling problem CSE 2008:11TH IEEE INTERNATIONAL CONFERENCE ON COMPUTATIONAL SCIENCE AND ENGINEERING, PROCEEDINGS, 2008, : 455 - 462