Calculation of Cable Force for Long-Span Rib Arch Bridge Construction Under Seasonal Ambient Temperature

被引:0
|
作者
Tian, Weifeng [1 ,2 ]
Zhou, Shuixing [1 ]
Saeed, Ayad Thabit [2 ]
机构
[1] Chongqing Jiaotong Univ, Sch Civil Engn & Architecture, Chongqing 400074, Peoples R China
[2] Chongqing Univ, Sch Civil Engn, Chongqing 400045, Peoples R China
关键词
Non-framework cable hoisting erection method; Long-span arch rib bridge; Cable force; Seasonal ambient temperature; Unstressed state control method;
D O I
10.4028/www.scientific.net/AMR.378-379.341
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Calculation of cable force under seasonal ambient temperature is the key and difficult problem in the construction of long-span rib arch bridge. It affects the final cable forces and deformations of arch rib after arch closure. Unstressed state control method is introduced in the construction of Daning River Bridge; unstressed qualities of ribs and unstressed length of cables can be obtained by optimization analysis of the maximum cantilever state in construction. According to unstressed state control method, the cable forces of each segment were calculated using the forward-iteration method. These results offer the basis for construction control, and guarantee the arch rib line and cable forces to meet the design requirements, and an arch closure with high precision.
引用
收藏
页码:341 / +
页数:2
相关论文
共 50 条
  • [41] Stability-based Risk Analysis for the Construction Phases of Long-Span CFST Arch Bridge
    Sun, Guo-fu
    Li, Shu-cai
    Zhou, Xue-jun
    Yu, Li-yuan
    PROCEEDINGS OF 2009 INTERNATIONAL SYMPOSIUM ON RISK CONTROL AND MANAGEMENT OF DESIGN, CONSTRUCTION AND OPERATION IN UNDERGROUND ENGINEERING, 2009, : 213 - 216
  • [42] Dynamic Characteristics of a Long-span Cable-stayed Bridge
    Hui, Liu
    MATERIALS ENGINEERING FOR ADVANCED TECHNOLOGIES, PTS 1 AND 2, 2011, 480-481 : 1496 - 1501
  • [43] Cable Health Monitoring System for Long-span Cable-stayed Bridge
    Gao Chao
    Li Xinke
    Guo Yongcai
    He Fuliang
    DISASTER ADVANCES, 2011, 4 : 130 - 135
  • [44] Damage Detection for Long-Span Cable-Stayed Bridge
    赵玲
    李爱群
    缪长青
    汪永兰
    Railway Engineering Science, 2006, (01) : 63 - 72
  • [45] Simulation and analysis of long-span cable-stayed bridge during construction based on ANSYS
    Wu, Fangwen
    Xue, Chengfeng
    ICMS2010: PROCEEDINGS OF THE THIRD INTERNATIONAL CONFERENCE ON MODELLING AND SIMULATION, VOL 1: ENGINEERING COMPUTATION AND FINITE ELEMENT ANALYSIS, 2010, : 341 - 345
  • [46] The key quality control technology of main cable erection in long-span suspension bridge construction
    Chen, Yongrui
    Wei, Wei
    Dai, Jie
    3RD INTERNATIONAL CONFERENCE ON ENERGY MATERIALS AND ENVIRONMENT ENGINEERING, 2017, 61
  • [47] Dynamic analysis and modal test of long-span cable-stayed bridge based on ambient excitation
    Chang-song Chen
    Dong-huang Yan
    Journal of Central South University of Technology, 2007, 14 : 135 - 139
  • [48] Dynamic analysis and modal test of long-span cable-stayed bridge based on ambient excitation
    Chen Chang-song
    Yan Dong-huang
    JOURNAL OF CENTRAL SOUTH UNIVERSITY OF TECHNOLOGY, 2007, 14 (01): : 135 - 139
  • [49] Dynamic analysis and modal test of long-span cable-stayed bridge based on ambient excitation
    陈常松
    颜东煌
    Journal of Central South University, 2007, (01) : 135 - 139
  • [50] Optimization of Suspender Cable Force of Long-Span Concrete Arch Bridges Based on Embedded Matrix Method
    Xie, Kaizhong
    Yu, Mengsheng
    Yao, Xinyu
    Wang, Longlin
    Hao, Tianzhi
    Wang, Hua
    ADVANCES IN CIVIL ENGINEERING, 2022, 2022