Calculation of Cable Force for Long-Span Rib Arch Bridge Construction Under Seasonal Ambient Temperature

被引:0
|
作者
Tian, Weifeng [1 ,2 ]
Zhou, Shuixing [1 ]
Saeed, Ayad Thabit [2 ]
机构
[1] Chongqing Jiaotong Univ, Sch Civil Engn & Architecture, Chongqing 400074, Peoples R China
[2] Chongqing Univ, Sch Civil Engn, Chongqing 400045, Peoples R China
关键词
Non-framework cable hoisting erection method; Long-span arch rib bridge; Cable force; Seasonal ambient temperature; Unstressed state control method;
D O I
10.4028/www.scientific.net/AMR.378-379.341
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Calculation of cable force under seasonal ambient temperature is the key and difficult problem in the construction of long-span rib arch bridge. It affects the final cable forces and deformations of arch rib after arch closure. Unstressed state control method is introduced in the construction of Daning River Bridge; unstressed qualities of ribs and unstressed length of cables can be obtained by optimization analysis of the maximum cantilever state in construction. According to unstressed state control method, the cable forces of each segment were calculated using the forward-iteration method. These results offer the basis for construction control, and guarantee the arch rib line and cable forces to meet the design requirements, and an arch closure with high precision.
引用
收藏
页码:341 / +
页数:2
相关论文
共 50 条
  • [21] Simulation computation of arch-rib assembling based on cable adjustment for long span CFST arch bridge
    Fan, Jian-Feng
    Wang, Ji
    Peng, Zi-Qiang
    Yang, Yan
    Advances in Structural Engineering:Theory and Applications Vols 1 and 2, 2006, : 2033 - 2037
  • [22] Distribution of Internal Force and Stress in the Arch Ring of Railway Long-span Steel Truss Arch Bridge under Seismic Excitation
    Zhang, Yongliang
    Liu, Haibo
    Chen, Xingchong
    Liu, Congcong
    Journal of Railway Engineering Society, 2021, 38 (03): : 35 - 40
  • [23] SINGULARITIES OBSERVED IN THE CALCULATION OF THE MODAL DAMPING RATIO OF A LONG-SPAN METAL ARCH BRIDGE
    López-Aragón, J.A.
    Astiz, M.A.
    ce/papers, 2024, 7 (1-2) : 280 - 289
  • [24] Novel long-span cable-stayed deck arch bridge: Concept and structural characteristics
    Lai, Yaping
    Wu, Yanzi
    Wang, Guannan
    ENGINEERING STRUCTURES, 2024, 308
  • [25] Interaction between Track and Long-Span Cable-Stayed Bridge: Recommendations for Calculation
    Xie, Kaize
    Zhao, Weigang
    Cai, Xiaopei
    Wang, Ping
    Zhao, Jia
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2020, 2020 (2020)
  • [26] Wind Tunnel Test on Buffeting of Long-Span Three-Truss Steel Arch Bridge under Construction
    Zhao, Jian
    An, Lu-Ming
    Ren, Yan-Long
    Liu, Yin-Tao
    Zhang, Peng-Zhi
    Bridge Construction, 2021, 51 (05) : 29 - 36
  • [27] Key Construction Techniques for Long-Span Railway Arch Bridge in Mountainous Region of Plateau
    Wang, Rui
    Bridge Construction, 2020, 50 (01) : 105 - 110
  • [28] Key Construction Technology and Monitoring of Long-Span Steel Box Tied Arch Bridge
    Sun, Jianpeng
    Li, Jinbin
    Jiang, Yingbiao
    Ma, Xiaogang
    Tan, Zihan
    Zhufu, Gaolin
    INTERNATIONAL JOURNAL OF STEEL STRUCTURES, 2023, 23 (01) : 191 - 207
  • [29] Key Construction Technology and Monitoring of Long-Span Steel Box Tied Arch Bridge
    Jianpeng Sun
    Jinbin Li
    Yingbiao Jiang
    Xiaogang Ma
    Zihan Tan
    Gaolin Zhufu
    International Journal of Steel Structures, 2023, 23 (1) : 191 - 207
  • [30] Dynamic control of the arch rib alignment for long-span concrete-filled steel-tube arch bridge
    Zhang, Kaiyin
    Liu, Sanyuan
    He, Yuwei
    Yi, Guangming
    Wuhan Jiaotong Keji Daxue Xuebao/Journal of Wuhan Transportation University, 2000, 24 (01): : 1 - 4