Calculation of Cable Force for Long-Span Rib Arch Bridge Construction Under Seasonal Ambient Temperature

被引:0
|
作者
Tian, Weifeng [1 ,2 ]
Zhou, Shuixing [1 ]
Saeed, Ayad Thabit [2 ]
机构
[1] Chongqing Jiaotong Univ, Sch Civil Engn & Architecture, Chongqing 400074, Peoples R China
[2] Chongqing Univ, Sch Civil Engn, Chongqing 400045, Peoples R China
关键词
Non-framework cable hoisting erection method; Long-span arch rib bridge; Cable force; Seasonal ambient temperature; Unstressed state control method;
D O I
10.4028/www.scientific.net/AMR.378-379.341
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Calculation of cable force under seasonal ambient temperature is the key and difficult problem in the construction of long-span rib arch bridge. It affects the final cable forces and deformations of arch rib after arch closure. Unstressed state control method is introduced in the construction of Daning River Bridge; unstressed qualities of ribs and unstressed length of cables can be obtained by optimization analysis of the maximum cantilever state in construction. According to unstressed state control method, the cable forces of each segment were calculated using the forward-iteration method. These results offer the basis for construction control, and guarantee the arch rib line and cable forces to meet the design requirements, and an arch closure with high precision.
引用
收藏
页码:341 / +
页数:2
相关论文
共 50 条
  • [31] Driving Dynamic Response Analysis of Long-span Arch Bridge Considering Temperature Deformation
    Zhu, Zhihui
    Liu, Jie
    Zhou, Zhihui
    Yan, Mingming
    Zhang, Lei
    He, Xuhui
    Journal of Railway Engineering Society, 2019, 36 (03) : 26 - 31
  • [32] Seismic control of long-span arch bridge under spatially variable seismic excitation
    Faculty of Civil Engineering, Chongqing University, Chongqing 400030, China
    J Vib Shock, 2008, 7 (83-86+90):
  • [33] Calculating Method of Arch Rib Installation Alignment of Large Span Cable Hoisting Arch Bridge
    Xiong Shaohui
    Chen Wei
    Wang Feng
    INTERNATIONAL CONFERENCE ON SMART TRANSPORTATION AND CITY ENGINEERING 2021, 2021, 12050
  • [34] Cable Force Adjustment for Long-Span Cable-Stayed Bridge Based on Multilayer Perceptron Deep Learning
    Shan, De-Shan
    Zhang, Xiao
    Gu, Xiao-Yu
    Li, Qiao
    Bridge Construction, 2021, 51 (01) : 14 - 20
  • [35] CREEP CHARACTERISTICS OF CONCRETE USED IN LONG-SPAN ARCH BRIDGE
    Wang, Yongbao
    Zhao, Renda
    Jia, Yi
    Liao, Ping
    BALTIC JOURNAL OF ROAD AND BRIDGE ENGINEERING, 2019, 14 (01): : 18 - 36
  • [36] A Long-span Network Arch Bridge for Road and Rail Traffic
    Zhou, Weixiang
    Chen, Liang
    Shao, Changyu
    Wu, Xiao
    STRUCTURAL ENGINEERING INTERNATIONAL, 2022, 32 (02) : 211 - 215
  • [37] Broken cable-induced dynamic response of long-span concrete cable stayed bridge during construction
    Zhang Y.
    Fang Z.
    Lu J.
    Xiang Y.
    Long H.
    Zhendong yu Chongji/Journal of Vibration and Shock, 2021, 40 (05): : 237 - 246
  • [38] Cable Force Calculation of Cable Hoisting of CFST Arch Bridge Research
    Jia, Yi
    Wei, Chaokuan
    Huang, Ziqiu
    Li, Qi
    Liao, Ping
    Lin, Wencong
    BUILDINGS, 2023, 13 (09)
  • [39] Wind-induced load capacity analysis and parametric study of a long-span steel arch bridge under construction
    Cheng, J
    Jiang, JJ
    Xiao, RC
    Xia, M
    COMPUTERS & STRUCTURES, 2003, 81 (26-27) : 2513 - 2524
  • [40] Analysis of reliability numerical simulation of long-span steel trussed arch bridge in construction stage
    Cai Lurong
    Li Yinghua
    PROCEEDINGS OF THE 2017 3RD INTERNATIONAL FORUM ON ENERGY, ENVIRONMENT SCIENCE AND MATERIALS (IFEESM 2017), 2017, 120 : 776 - 779