Calculating Method of Arch Rib Installation Alignment of Large Span Cable Hoisting Arch Bridge

被引:1
|
作者
Xiong Shaohui [1 ]
Chen Wei [2 ]
Wang Feng [3 ]
机构
[1] China Merchants Chongqing Commun Technol Res & De, State Key Lab Struct Dynam Bridge Engn, Chongqing, Peoples R China
[2] Fengdu Cty Urban Dev & Construct Serv Ctr, Chongqing, Peoples R China
[3] Nanchang Yucheng Commun Design Co Ltd, Nanchang, Jiangxi, Peoples R China
关键词
Long-span arch bridge; cable hoisting; installation line; main tower deviation; anchor cable; buckle cable;
D O I
10.1117/12.2614132
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The cable hoisting method is the most important construction method for long-span arch bridges. During the hoisting process of the arch rib, the incomplete consolidation of the segment joint due to the temporary connection of the bolts, the deflection of the tower caused by the temporary construction load of the main cable, and the free expansion and contraction of the anchor cable and the buckle caused by the temperature change will all affect the arch rib. The installation line has a greater impact. In this paper, the double-element model calculation method considering the stiffness loss can be used to calculate the correction value of the arch rib installation line more accurately when considering the incomplete consolidation of the arch rib segment joint; the geometric relationship between the cable and the tower is used to deduce the tower The correction calculation formula for the installation alignment of the deflection of the frame and the free expansion and contraction of the anchor cable and the buckle caused by the temperature change is calculated to calculate the correction value of the installation alignment of the arch rib due to the deviation of the tower and the temperature change of the anchor cable and the buckle; A calculation formula for the installation line shape of the arch rib of a large-span cable hoisting arch bridge is proposed, which comprehensively considers various influencing factors. The installation line shape of the arch rib is calculated. Taking the Yunnan Lancang River Bridge as an example, the arch line shape error meets the specification requirements. This article can provide a useful reference for the linear calculation of the arch rib installation of the cable-mounted arch bridge.
引用
收藏
页数:11
相关论文
共 50 条
  • [1] Study of alignment control method for installation of arch ribs of long span CFST arch bridge
    Gu, Ying
    Yao, Chang-Rong
    Li, Ya-Dong
    Kang, Ling
    Jie, Zhi-Yu
    Bridge Construction, 2014, 44 (01) : 107 - 113
  • [2] Wind-induced response of the arch rib section of an arch bridge in cable hoisting process
    Gao, Zilong
    Peng, Zhihui
    Yang, Bokai
    Tang, Haojun
    Zhang, Yao
    Li, Yongle
    Zhendong yu Chongji/Journal of Vibration and Shock, 2024, 43 (18): : 239 - 247
  • [4] Arch First and Beam Later: Arch-Rib Integral Installation Construction Technology for Large-Span Tied-Arch Bridge
    Xie, Wenxiang
    Zhao, Tingsheng
    Tang, Jingjing
    Zhang, Yong
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2017, 143 (08)
  • [5] Construction Control Technology of Cable Hoisting System for the Arch Rib of Steel Box Bridge
    Wang, Yu
    Wei, Yanhong
    Hu, Guifen
    ADVANCED CONSTRUCTION TECHNOLOGIES, 2014, 919-921 : 1403 - +
  • [6] Calculation method of eccentricity increase coefficient of arch rib of long⁃span arch bridge
    Guo F.
    Li P.-F.
    Mao J.-Y.
    Dong Y.-Z.
    Jilin Daxue Xuebao (Gongxueban)/Journal of Jilin University (Engineering and Technology Edition), 2022, 52 (06): : 1404 - 1412
  • [7] Research on Optimal Arch Rib Inclination of Large Span Highway CFST through Arch Bridge
    Liu, Zengwu
    Wu, Yuexing
    Wang, Chengwei
    Fan, Yonghui
    Luo, Chao
    Wang, Shaorui
    BUILDINGS, 2023, 13 (06)
  • [8] Geometric nonlinear analysis of the rib-hoisting for long-span CFST arch bridge
    Li, Shun-Guo
    Qu, Wei-Lian
    Lu, Zhe-An
    ADVANCES IN STRUCTURAL ENGINEERING:THEORY AND APPLICATIONS VOLS 1 AND 2, 2006, : 2058 - 2063
  • [9] Integral hoisting technology of arch rib of concrete filled steel tube arch bridge
    Zeng, Wenjie
    Yang, Siqi
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING II, PTS 1-4, 2013, 405-408 : 3086 - 3089
  • [10] Simulation computation of arch-rib assembling based on cable adjustment for long span CFST arch bridge
    Fan, Jian-Feng
    Wang, Ji
    Peng, Zi-Qiang
    Yang, Yan
    Advances in Structural Engineering:Theory and Applications Vols 1 and 2, 2006, : 2033 - 2037