Polynomial algorithms for resource-constrained and multiprocessor task scheduling problems

被引:41
|
作者
Brucker, P
Kramer, A
机构
[1] Universität Osnabrück, Fachbereich Mathematik / Informatik
关键词
scheduling; resource-constrained scheduling; multiprocessor scheduling; job shop; flow shop;
D O I
10.1016/0377-2217(95)00350-9
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Resource-constrained scheduling problems with a fixed number of task types are considered in which, in addition, either the processing times are bounded or the number of processors is fixed. For problems with makespan, (weighted) mean now time, weighted number of tardy tasks, and sum of tardiness as objective functions polynomial time algorithms are presented. These algorithms generalize results derived by Blaiewicz ct al. (1989) for makespan problems and solve open problems listed by Hoogeveen et al. (1994). Furthermore, results for shop problems with multiprocessor tasks and unit processing times, in which either the number of jobs or the number of stages is fixed, are derived.
引用
收藏
页码:214 / 226
页数:13
相关论文
共 50 条
  • [41] Performance of Resource-Constrained Scheduling Heuristics
    Franco-Duran, Diana M.
    de la Garza, Jesus M.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2020, 146 (04)
  • [42] Disorder considerations in resource-constrained scheduling
    Christodoulou, Symeon E.
    Ellinas, Georgios N.
    Aslani, Pooyan
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2009, 27 (03) : 229 - 240
  • [43] Tabu search for resource-constrained scheduling
    Verhoeven, MGA
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 106 (2-3) : 266 - 276
  • [44] A GRASP for a resource-constrained scheduling problem
    Sirdey R.
    Carlier J.
    Nace D.
    [J]. International Journal of Innovative Computing and Applications, 2010, 2 (03) : 143 - 149
  • [45] A hybrid framework for over-constrained generalized resource-constrained project scheduling problems
    Lim, A
    Rodrigues, B
    Thangarajoo, R
    Xiao, F
    [J]. ARTIFICIAL INTELLIGENCE REVIEW, 2004, 22 (03) : 211 - 243
  • [46] Resource-constrained scheduling in repetitive projects
    Zhang, Li-hui
    Zou, Xin
    Chen, Xin-lu
    [J]. Advances in Information Sciences and Service Sciences, 2012, 4 (14): : 287 - 294
  • [47] Solving resource-constrained project scheduling problems using Tabu Search
    Ikonomou, A
    Galletly, JE
    Daniel, RC
    [J]. INTELLIGENT SYSTEMS FOR MANUFACTURING: MULTI-AGENT SYSTEMS AND VIRTUAL ORGANIZATION, 1998, : 311 - 322
  • [48] Using Particle Swarm Optimization to Solve Resource-constrained Scheduling Problems
    Lo, Shih-Tang
    Chen, Ruey-Maw
    Shiau, Der-Fang
    Wu, Chung-Lun
    [J]. 2008 IEEE CONFERENCE ON SOFT COMPUTING IN INDUSTRIAL APPLICATIONS SMCIA/08, 2009, : 38 - +
  • [49] SIMULATED ANNEALING FOR RESOURCE-CONSTRAINED SCHEDULING
    JEFFCOAT, DE
    BULFIN, RL
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1993, 70 (01) : 43 - 51
  • [50] Optimization Strategies for Resource-Constrained Project Scheduling Problems in Underground Mining
    Hill, Alessandro
    Brickey, Andrea J.
    Cipriano, Italo
    Goycoolea, Marcos
    Newman, Alexandra
    [J]. INFORMS JOURNAL ON COMPUTING, 2022, 34 (06) : 3042 - 3058