Polynomial algorithms for resource-constrained and multiprocessor task scheduling problems

被引:41
|
作者
Brucker, P
Kramer, A
机构
[1] Universität Osnabrück, Fachbereich Mathematik / Informatik
关键词
scheduling; resource-constrained scheduling; multiprocessor scheduling; job shop; flow shop;
D O I
10.1016/0377-2217(95)00350-9
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Resource-constrained scheduling problems with a fixed number of task types are considered in which, in addition, either the processing times are bounded or the number of processors is fixed. For problems with makespan, (weighted) mean now time, weighted number of tardy tasks, and sum of tardiness as objective functions polynomial time algorithms are presented. These algorithms generalize results derived by Blaiewicz ct al. (1989) for makespan problems and solve open problems listed by Hoogeveen et al. (1994). Furthermore, results for shop problems with multiprocessor tasks and unit processing times, in which either the number of jobs or the number of stages is fixed, are derived.
引用
收藏
页码:214 / 226
页数:13
相关论文
共 50 条
  • [31] Consolidated optimization algorithm for resource-constrained project scheduling problems
    Elsayed, Saber
    Sarker, Ruhul
    Ray, Tapabrata
    Coello Coello, Carlos
    [J]. INFORMATION SCIENCES, 2017, 418 : 346 - 362
  • [32] A New MBS Representation for Resource-Constrained Project Scheduling Problems
    Hao, Xingxing
    Liu, Jing
    [J]. 2016 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2016, : 217 - 224
  • [33] Solving resource-constrained construction scheduling problems with overlaps by metaheuristic
    Bozejko, Wojciech
    Hejducki, Zdzislaw
    Uchronski, Mariusz
    Wodecki, Mieczyslaw
    [J]. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2014, 20 (05) : 649 - 659
  • [34] An Adaptive MO-HGA for Resource-Constrained Transport Task Scheduling
    Wang, Jian
    Wang, Hongwei
    [J]. ADVANCES IN NEURAL NETWORKS - ISNN 2009, PT 1, PROCEEDINGS, 2009, 5551 : 1041 - 1052
  • [35] A Dynamic Scheduling Algorithm for Time- and Resource-Constrained Task Networks
    Hao, Qi
    Xue, Yunjiao
    Wang, Shuying
    Shen, Weiming
    [J]. 2009 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN AND CYBERNETICS (SMC 2009), VOLS 1-9, 2009, : 4402 - 4407
  • [36] A framework for integration model of resource-constrained scheduling using genetic algorithms
    Kim, JL
    Ellis, RD
    [J]. Proceedings of the 2005 Winter Simulation Conference, Vols 1-4, 2005, : 2119 - 2126
  • [37] A tool to test and validate algorithms for the resource-constrained project scheduling problem
    Vanhoucke, Mario
    Coelho, Jose
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 118 : 251 - 265
  • [38] Optimization algorithms for solving resource-constrained project scheduling problem: A review
    Liu, Shi-Xin
    Wang, Meng-Guang
    Tang, Jia-Fu
    [J]. Kongzhi yu Juece/Control and Decision, 2001, 16 (SUPPL.): : 647 - 651
  • [39] Approximation Algorithms on Multiprocessor Task Scheduling
    Huang Jingui
    Li Rongheng
    [J]. 2009 INTERNATIONAL CONFERENCE ON COMPUTER ENGINEERING AND TECHNOLOGY, VOL II, PROCEEDINGS, 2009, : 303 - +
  • [40] The Complexity Landscape of Resource-Constrained Scheduling
    Ganian, Robert
    Hamm, Thekla
    Mescoff, Guillaume
    [J]. PROCEEDINGS OF THE TWENTY-NINTH INTERNATIONAL JOINT CONFERENCE ON ARTIFICIAL INTELLIGENCE, 2020, : 1741 - 1747