A New MBS Representation for Resource-Constrained Project Scheduling Problems

被引:0
|
作者
Hao, Xingxing [1 ]
Liu, Jing [1 ]
机构
[1] Xidian Univ, Key Lab Intelligent Percept & Image, Understanding Minist Educ, Xian, Peoples R China
关键词
moving block sequence; resource-constrained project scheduling problem; evolutionary algorithm; PARTICLE SWARM OPTIMIZATION; GENETIC ALGORITHM; EVOLUTIONARY ALGORITHM;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In this paper, a new moving block sequence (MBS) representation for resource-constrained project scheduling problems (RCPSPs) is proposed, which is different from the classical activity list that has been widely used for RCPSPs. An activity in a project of RCPSPs has fixed duration and resource demands, thus, it can be modeled as a rectangle block whose height represents the resource demands and width the duration. Therefore, by modeling every activity in a project as a block, a project that consists of N activities can be represented as a permutation of N blocks that satisfy the precedence constraints. Then, for every activity in the project, four initial positions and corresponding move modes are designed, by using which activities can be moved from their initial positions to the appropriate locations that minimize the makespan of the project without violating the precedence and resource constraints. Based on this newly designed MBS representation, the multi-agent evolutionary algorithm (MAEA) is used for solving RCPSPs. The comparison with 16 existing state-of-the-art algorithms on benchmark J30 test set, which contains 480 instances in total, shows that the proposed algorithm is competitive in solving RCPSPs.
引用
收藏
页码:217 / 224
页数:8
相关论文
共 50 条
  • [1] Flexible Scheduling Approach for Resource-Constrained Project Scheduling Problems
    Liu, Shixin
    Tukel, Oya I.
    Rom, W.
    2008 7TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-23, 2008, : 3522 - +
  • [2] MILP Formulation for Resource-Constrained Project Scheduling Problems
    Kyriakidis, Thomas S.
    Kopanos, Georgios M.
    Georgiadis, Michael C.
    21ST EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, 2011, 29 : 880 - 884
  • [3] SMT encodings for Resource-Constrained Project Scheduling Problems
    Bofill, Miquel
    Coll, Jordi
    Suy, Josep
    Villaret, Mateu
    COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 149
  • [4] Lower bounds for resource-constrained project scheduling problems
    Brucker, P
    Knust, S
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 149 (02) : 302 - 313
  • [5] New representation to reduce the search space for the resource-constrained project scheduling problem
    Moumene, Khaled
    Ferland, Jacques A.
    RAIRO-OPERATIONS RESEARCH, 2008, 42 (02) : 215 - 228
  • [6] A survey in the resource-constrained project and multi-project scheduling problems
    Ben Issa, Samer
    Tu, Yiliu
    JOURNAL OF PROJECT MANAGEMENT, 2020, 5 (02) : 117 - 138
  • [7] New strategies for stochastic resource-constrained project scheduling
    Salim Rostami
    Stefan Creemers
    Roel Leus
    Journal of Scheduling, 2018, 21 : 349 - 365
  • [8] New strategies for stochastic resource-constrained project scheduling
    Rostami, Salim
    Creemers, Stefan
    Leus, Roel
    JOURNAL OF SCHEDULING, 2018, 21 (03) : 349 - 365
  • [9] Handling Alternative Activities in Resource-Constrained Project Scheduling Problems
    Kuster, Juergen
    Jannach, Dietmar
    Friedrich, Gerhard
    20TH INTERNATIONAL JOINT CONFERENCE ON ARTIFICIAL INTELLIGENCE, 2007, : 1960 - 1965
  • [10] Consolidated optimization algorithm for resource-constrained project scheduling problems
    Elsayed, Saber
    Sarker, Ruhul
    Ray, Tapabrata
    Coello Coello, Carlos
    INFORMATION SCIENCES, 2017, 418 : 346 - 362