共 50 条
- [11] RECOVERY AND UTILIZATION OF CONVERTER GAS FROM THE BASIC OXYGEN STEEL PLANT BRUCKHAUSEN OF THYSSEN-STAHL-AG STAHL UND EISEN, 1984, 104 (16): : 795 - 805
- [12] MODERNIZATION OF THE CONTINUOUS BLOOM CASTING PLANT AT THYSSEN-STAHL-AG IN DUISBURG STAHL UND EISEN, 1995, 115 (03): : 59 - 64
- [13] Commissioning and first results of the casting rolling plant of Thyssen Krupp Stahl AG STAHL UND EISEN, 2000, 120 (02): : 61 - 68
- [14] TAKO - The new PLTCM at Thyssen Krupp Stahl AG in Beeckerwerth works REVUE DE METALLURGIE-CAHIERS D INFORMATIONS TECHNIQUES, 2002, 99 (7-8): : 661 - 669
- [15] 2ND FURNACE CAMPAIGN, NEW SERVICE AND RESTARTING OPERATIONS AT BLAST FURNACE-6 AT THYSSEN-STAHL-AG IN DUISBURG-RUHRORT STAHL UND EISEN, 1984, 104 (22): : A10 - A10
- [16] 2ND FURNACE CAMPAIGN, RELINING AND RENEWED COMMISSIONING OF THE BLAST-FURNACE 6 OF THYSSEN STAHL AG IN DUISBURG-RUHRORT STAHL UND EISEN, 1985, 105 (03): : 145 - 151
- [17] THE NEW ANNEALING AND PICKLING LINE FOR STAINLESS-STEEL WIDE STRIP IN THE KREFELD WORKS OF THE THYSSEN STAHL-AG STAHL UND EISEN, 1993, 113 (03): : 85 - 91
- [18] ENVIRONMENTAL-PROTECTION IN THE IRON AND STEEL-INDUSTRY - STATEMENT OF THE THYSSEN-STAHL-AG STAHL UND EISEN, 1992, 112 (05): : 43 - 51
- [19] NEW OXYGEN (TOP BLOWING) STEEL PLANT OF AUGUST THYSSEN-HUTTE AG STAHL UND EISEN, 1970, 90 (02): : 53 - &
- [20] THE NEW HOT-DIP GALVANIZING LINE OF THYSSEN-STAHL-AG IN DUISBURG STAHL UND EISEN, 1993, 113 (08): : 77 - 80