共 50 条
- [31] NEW STRUCTURE AND DEVELOPMENT OF THE STEEL WORKS OF HOESCH-STAHL-AG STAHL UND EISEN, 1986, 106 (22): : I30 - &
- [32] Evolution of Converter Durability in Thyssen Stahl AG's Steel-making Shops after the Introduction of the TBM Process. Technische Berichte - Thyssen, 1984, 16 (02): : 103 - 108
- [33] Construction and start-up of the new recoiling line at the wide hot strip mill of Thyssen Krupp Stahl AG STAHL UND EISEN, 2000, 120 (08): : 41 - 43
- [34] Power, control and instrumentation system for the new DC electric arc furnace at the Peine steel plant of Preussag Stahl AG MPT Metallurgical Plant and Technology International, 1996, 19 (05): : 34 - 40
- [35] Power, control and instrumentation system for the new DC electric arc furnace at the Peine steel plant of Preussag Stahl AG STAHL UND EISEN, 1996, 116 (11): : 77 - &
- [36] HALT station at the Dortmund steel plant of Krupp Hoesch Stahl AG - design and operating results Stahl und Eisen, 1997, 117 (05): : 45 - 52
- [37] Further development of the vacuum process technology at the steel plant of Krupp Hoesch Stahl AG in Dortmund STAHL UND EISEN, 1996, 116 (08): : 101 - &
- [38] New hot-dip galvanising plant of Krupp Hoesch Stahl AG in Bochum MPT Metallurgical Plant and Technology International, 1994, 17 (03): : 158 - 169
- [39] HALT facility at the Dortmund Steel Plant of Krupp Hoesch Stahl AG - Design and operating results. STAHL UND EISEN, 1997, 117 (05): : 45 - +
- [40] THE NEW HOT-DIP GALVANIZING PLANT OF KRUPP-HOESCH-STAHL-AG IN BOCHUM STAHL UND EISEN, 1994, 114 (06): : 193 - 200