The new automated steel plant laboratory of Thyssen Stahl AG in Ruhrort.

被引:0
|
作者
vonWachtendonk, HJ
Marschinke, W
Hawickhorst, G
vandenBosch, J
机构
[1] HERZOG MASCHINENFABRIK GMBH & CO,OSNABRUCK,GERMANY
[2] PHILIPS ANALYT XRAY,ALMELO,NETHERLANDS
来源
STAHL UND EISEN | 1996年 / 116卷 / 01期
关键词
D O I
暂无
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
When the steel plant laboratory was reorganised, the decision was made to have an automated, central round-the-clock production control analysis facility equipped with pneumatic tube conveyor system, sample preparation machines and several analysis devices. The laboratory is located on the converter charging platform of the basic-oxygen furnace steel plant in Ruhrort and includes two automatic grinders for steel samples, an automatic slag preparation unit, two spectrometers, X-ray fluorescence analysis equipment and four eco-analysis devices that are fed largely automatically. A software system controls the preparation machines and the conveyor system, while a further software system controls the analyses. This has made it possible to significantly shorten the analysis times. Preliminary samples from the converter are analysed within 140 s; slag analyses can be achieved in times of around 400 s (including sample login procedure and pneumatic tube conveyance). The shift manning levels have been reduced by some 80%.
引用
收藏
页码:55 / &
页数:6
相关论文
共 50 条
  • [31] NEW STRUCTURE AND DEVELOPMENT OF THE STEEL WORKS OF HOESCH-STAHL-AG
    MEININGHAUS, F
    BOUILLON, FK
    REDENZ, B
    SARDEMANN, K
    SCHROTT, R
    STAHL UND EISEN, 1986, 106 (22): : I30 - &
  • [32] Evolution of Converter Durability in Thyssen Stahl AG's Steel-making Shops after the Introduction of the TBM Process.
    Klages, Gerhard
    Schulz, Ekkehard
    Technische Berichte - Thyssen, 1984, 16 (02): : 103 - 108
  • [33] Construction and start-up of the new recoiling line at the wide hot strip mill of Thyssen Krupp Stahl AG
    Bosselmann, D
    Degner, R
    Friedrich, KE
    Giesemann, T
    Thiemann, G
    STAHL UND EISEN, 2000, 120 (08): : 41 - 43
  • [34] Power, control and instrumentation system for the new DC electric arc furnace at the Peine steel plant of Preussag Stahl AG
    Garmshausen, Rainer
    Hornig, Gunter
    Eckardt, Dietmar
    MPT Metallurgical Plant and Technology International, 1996, 19 (05): : 34 - 40
  • [35] Power, control and instrumentation system for the new DC electric arc furnace at the Peine steel plant of Preussag Stahl AG
    Garmshausen, R
    Hornig, G
    Eckardt, D
    STAHL UND EISEN, 1996, 116 (11): : 77 - &
  • [36] HALT station at the Dortmund steel plant of Krupp Hoesch Stahl AG - design and operating results
    Rasim, Wolfgang A.
    Kessler, Roland
    Seiffert, Gunter
    Garten, Lutz
    Becker, Jens-Ulrik
    Stahl und Eisen, 1997, 117 (05): : 45 - 52
  • [37] Further development of the vacuum process technology at the steel plant of Krupp Hoesch Stahl AG in Dortmund
    Garten, L
    Greschupp, S
    Kessler, R
    STAHL UND EISEN, 1996, 116 (08): : 101 - &
  • [38] New hot-dip galvanising plant of Krupp Hoesch Stahl AG in Bochum
    Huttebraucker, Klaus-Friedrich
    Litzke, Horst
    Rudolph, Wolfgang
    Schonenberg, Rudolf
    Steck, Klaus
    Tacke, Gerhard
    MPT Metallurgical Plant and Technology International, 1994, 17 (03): : 158 - 169
  • [39] HALT facility at the Dortmund Steel Plant of Krupp Hoesch Stahl AG - Design and operating results.
    Rasim, WA
    Kessler, R
    Seiffert, G
    Garten, L
    Becker, JU
    STAHL UND EISEN, 1997, 117 (05): : 45 - +
  • [40] THE NEW HOT-DIP GALVANIZING PLANT OF KRUPP-HOESCH-STAHL-AG IN BOCHUM
    HUTTEBRAUCKER, KF
    LITZKE, H
    RUDOLPH, W
    SCHONENBERG, R
    STECK, K
    TACKE, G
    STAHL UND EISEN, 1994, 114 (06): : 193 - 200