New hot-dip galvanising plant of Krupp Hoesch Stahl AG in Bochum

被引:0
|
作者
Huttebraucker, Klaus-Friedrich [1 ]
Litzke, Horst [1 ]
Rudolph, Wolfgang [1 ]
Schonenberg, Rudolf [1 ]
Steck, Klaus [1 ]
Tacke, Gerhard [1 ]
机构
[1] Krupp Hoesch Stahl AG Werk Bochum, Bochum, Germany
关键词
Cold rolling mills;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:158 / 169
相关论文
共 50 条
  • [1] THE NEW HOT-DIP GALVANIZING PLANT OF KRUPP-HOESCH-STAHL-AG IN BOCHUM
    HUTTEBRAUCKER, KF
    LITZKE, H
    RUDOLPH, W
    SCHONENBERG, R
    STECK, K
    TACKE, G
    [J]. STAHL UND EISEN, 1994, 114 (06): : 193 - 200
  • [2] Modernisation of the horizontal hot-dip galvanising line at Preussag Stahl AG
    Zimnik, W
    Schanderl, O
    [J]. STAHL UND EISEN, 1998, 118 (06): : 55 - +
  • [3] INSTALLATION OF A CHANGING POT SYSTEM IN A HOT-DIP GALVANIZING LINE OF THE HOESCH-STAHL-AG
    BECHEM, W
    FURKEN, L
    ZWINGMANN, R
    KNUPFER, P
    [J]. STAHL UND EISEN, 1990, 110 (06): : 83 - 90
  • [4] HOT-DIP GALVANISING IN AN AUTOMATIC PLANT.
    Anon
    [J]. Product Finishing (London), 1988, 41 (04):
  • [5] MERGER OF ESTEL HOESCH WERKE AG AND KRUPP STAHL AG/KRUPP SUDWESTFALEN AG
    不详
    [J]. STAHL UND EISEN, 1982, 102 (04): : 189 - 189
  • [6] THE NEW HOT-DIP GALVANIZING LINE OF THYSSEN-STAHL-AG IN DUISBURG
    GREIS, P
    [J]. STAHL UND EISEN, 1993, 113 (08): : 77 - 80
  • [7] PLANT OPERATIONAL EXPERIENCE WITH THE UHP FURNACE OF KRUPP-STAHL-AG IN THE WORKS BOCHUM
    BETTZIECHE, W
    BROD, H
    FIGGE, HJ
    WENDT, P
    [J]. STAHL UND EISEN, 1984, 104 (03): : 115 - 121
  • [8] Further development of the vacuum process technology at the steel plant of Krupp Hoesch Stahl AG in Dortmund
    Garten, L
    Greschupp, S
    Kessler, R
    [J]. STAHL UND EISEN, 1996, 116 (08): : 101 - &
  • [9] HALT station at the Dortmund steel plant of Krupp Hoesch Stahl AG - design and operating results
    Rasim, Wolfgang A.
    Kessler, Roland
    Seiffert, Gunter
    Garten, Lutz
    Becker, Jens-Ulrik
    [J]. Stahl und Eisen, 1997, 117 (05): : 45 - 52
  • [10] HALT facility at the Dortmund Steel Plant of Krupp Hoesch Stahl AG - Design and operating results.
    Rasim, WA
    Kessler, R
    Seiffert, G
    Garten, L
    Becker, JU
    [J]. STAHL UND EISEN, 1997, 117 (05): : 45 - +