共 31 条
- [1] REVAMPING OF THE STEEL DEGASSING PLANT IN THE OXYGEN STEELMAKING PLANT-NO-1 OF THYSSEN-STAHL-AG [J]. STAHL UND EISEN, 1993, 113 (06): : 69 - 72
- [2] THE NEW DUST REMOVING SYSTEM OF THE BEECKERWERTH BASIC OXYGEN STEELMAKING PLANT OF THYSSEN-STAHL-AG [J]. STAHL UND EISEN, 1990, 110 (04): : 137 - 139
- [3] MODERNIZATION OF THE CONTINUOUS BLOOM CASTING PLANT AT THYSSEN-STAHL-AG IN DUISBURG [J]. STAHL UND EISEN, 1995, 115 (03): : 59 - 64
- [4] REUSE OF RECOVERED PROCESS DUSTS IN THE TBM-CONVERTER OF THYSSEN-STAHL-AG [J]. STAHL UND EISEN, 1988, 108 (22): : I27 - I27
- [5] AUTOMATION IN THE STEEL WORKS OF THYSSEN-STAHL-AG - IMPROVEMENT OF PRODUCT QUALITY, PLANT FLEXIBILITY AND PRODUCT RANGE [J]. STAHL UND EISEN, 1992, 112 (05): : 105 - 112
- [6] THE ELECTRIC STEELMAKING PLANT OF THYSSEN-STAHL-AG IN OBERHAUSEN AND ITS DEVELOPMENT FROM 1979 TO 1987 [J]. STAHL UND EISEN, 1988, 108 (06): : 281 - 288
- [7] ENVIRONMENTAL-PROTECTION IN THE IRON AND STEEL-INDUSTRY - STATEMENT OF THE THYSSEN-STAHL-AG [J]. STAHL UND EISEN, 1992, 112 (05): : 43 - 51
- [8] INJECTION PROCESSES FOR HOT METAL AND STEEL MELT TREATMENT IN THE STEEL PLANTS OF THYSSEN-STAHL-AG - PRESENT STATE AND DEVELOPMENTS [J]. STAHL UND EISEN, 1985, 105 (11): : 617 - 622
- [9] The new automated steel plant laboratory of Thyssen Stahl AG in Ruhrort. [J]. STAHL UND EISEN, 1996, 116 (01): : 55 - &
- [10] UTILIZATION OF THE CONVERTER GAS IN THE RHEINHAUSEN BOF STEELMAKING PLANT OF KRUPP-STAHL-AG [J]. STAHL UND EISEN, 1984, 104 (02): : 61 - 67