共 50 条
- [1] SECONDARY TUST COLLECTING PLANS OF THE RUHRORT STEELWORKS OF THYSSEN-STAHL-AG STAHL UND EISEN, 1983, 103 (19): : 959 - 961
- [2] THE NEW ELECTROLYTIC ZINC-COATING PLANT OF THYSSEN STAHL AG STAHL UND EISEN, 1987, 107 (25-26): : 1269 - 1271
- [3] CONSTRUCTION OF A NEW PRIMARY AND SECONDARY DUST REMOVING PLANT IN THE STEEL WORKS BEECKERWERTH OF THYSSEN STAHL AG STAHL UND EISEN, 1987, 107 (20): : 937 - 938
- [4] REVAMPING OF THE STEEL DEGASSING PLANT IN THE OXYGEN STEELMAKING PLANT-NO-1 OF THYSSEN-STAHL-AG STAHL UND EISEN, 1993, 113 (06): : 69 - 72
- [5] THE NEW ELECTRIC STEEL PLANT OF THYSSEN-AG IN OBERHAUSEN STAHL UND EISEN, 1980, 100 (06): : 274 - 275
- [6] Production of electrical sheet and IF steel grades at Thyssen Krupp Stahl AG Stahl Eisen, 8 (69-72):
- [7] Production of electrical sheet and IF steel grades at Thyssen Krupp Stahl AG STAHL UND EISEN, 1998, 118 (08): : 69 - +
- [8] Process robustness in the BOF steel plants of Thyssen Krupp Stahl AG STAHL UND EISEN, 1999, 119 (05): : 89 - +
- [9] THE NEW DUST REMOVING SYSTEM OF THE BEECKERWERTH BASIC OXYGEN STEELMAKING PLANT OF THYSSEN-STAHL-AG STAHL UND EISEN, 1990, 110 (04): : 137 - 139
- [10] AUTOMATION IN THE STEEL WORKS OF THYSSEN-STAHL-AG - IMPROVEMENT OF PRODUCT QUALITY, PLANT FLEXIBILITY AND PRODUCT RANGE STAHL UND EISEN, 1992, 112 (05): : 105 - 112