共 50 条
- [1] CONSTRUCTION OF A NEW PRIMARY AND SECONDARY DUST REMOVING PLANT IN THE STEEL WORKS BEECKERWERTH OF THYSSEN STAHL AG STAHL UND EISEN, 1987, 107 (20): : 937 - 938
- [4] THE NEW DUST REMOVING SYSTEM OF THE BEECKERWERTH BASIC OXYGEN STEELMAKING PLANT OF THYSSEN-STAHL-AG STAHL UND EISEN, 1990, 110 (04): : 137 - 139
- [5] Production of electrical sheet and IF steel grades at Thyssen Krupp Stahl AG Stahl Eisen, 8 (69-72):
- [6] Production of electrical sheet and IF steel grades at Thyssen Krupp Stahl AG STAHL UND EISEN, 1998, 118 (08): : 69 - +
- [7] Process robustness in the BOF steel plants of Thyssen Krupp Stahl AG STAHL UND EISEN, 1999, 119 (05): : 89 - +
- [8] Commissioning and first results of the casting rolling plant of Thyssen Krupp Stahl AG STAHL UND EISEN, 2000, 120 (02): : 61 - 68
- [9] New experience with an improved ceramic cup lining in the blast furnace hearths of Thyssen Krupp Stahl AG 58TH IRONMAKING CONFERENCE PROCEEDINGS, 1999, 58 : 681 - 690
- [10] New Experience with an Improved Ceramic Cup Lining in the Blast Furnace Hearths of Thyssen Krupp Stahl AG Iron and Steelmaker (I and SM), 1999, 26 (06): : 39 - 45