共 50 条
- [31] THE NEW ELECTROLYTIC ZINC-COATING PLANT OF THYSSEN STAHL AG STAHL UND EISEN, 1987, 107 (25-26): : 1269 - 1271
- [32] THE NEW ANNEALING AND PICKLING LINE FOR STAINLESS-STEEL WIDE STRIP IN THE KREFELD WORKS OF THE THYSSEN STAHL-AG STAHL UND EISEN, 1993, 113 (03): : 85 - 91
- [33] RECONSTRUCTION OF THE SLAB CONTINUOUS-CASTING PLANT IN THE WORKS RHEINHAUSEN OF KRUPP-STAHL-AG STAHL UND EISEN, 1986, 106 (04): : 161 - 162
- [34] Modern Rail Manufacture at Thyssen Stahl AG. Technische Berichte - Thyssen, 1988, 20 (01): : 147 - 159
- [35] The new automated steel plant laboratory of Thyssen Stahl AG in Ruhrort. STAHL UND EISEN, 1996, 116 (01): : 55 - &
- [36] Intermediate hearth repair technique at Thyssen Stahl AG 55TH IRONMAKING CONFERENCE PROCEEDINGS, 1996, 55 : 161 - 166
- [38] PROCESS ENGINEERING MEASURES DESIGNED TO INCREASE THE SINTERING CAPACITY IN THE WORKS SCHWELGERN-OF-THYSSEN-STAHL-AG STAHL UND EISEN, 1986, 106 (14-15): : 763 - 767
- [39] INFLUENCE OF BOTTOM FLUSHING ON METALLURGICAL RESULTS IN LD-STEEL WORKS OF KRUPP-STAHL-AG STAHL UND EISEN, 1982, 102 (21): : I14 - I14
- [40] Process Engineering Measures Designed to Increase the Sintering Capacity in the Schwelgern Works of Thyssen Stahl AG. Stahl und Eisen, 1986, 106 (14-15): : 21 - 25