共 50 条
- [41] AHP-Fuzzy Comprehensive Evaluation Method for Enterprise Technology Innovation Risk Assessment and Early Warning Research [J]. PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON RISK MANAGEMENT & ENGINEERING MANAGEMENT, VOLS 1 AND 2, 2008, : 23 - 27
- [42] STUDY ON RISK MANAGEMENT OF COAL MINE FLOOD BASED ON AHP-FUZZY COMPREHENSIVE EVALUATION ANALYSIS METHOD [J]. FRESENIUS ENVIRONMENTAL BULLETIN, 2021, 30 (4A): : 4436 - 4442
- [43] Research on Comprehensive Evaluation of the Students' Vocational Ability Based on AHP-FUZZY [J]. 2012 INTERNATIONAL CONFERENCE ON CONTROL ENGINEERING AND COMMUNICATION TECHNOLOGY (ICCECT 2012), 2012, : 791 - 793
- [44] Enterprise Electric Energy Efficiency Evaluation based on AHP-Fuzzy Method [J]. 2018 CHINA INTERNATIONAL CONFERENCE ON ELECTRICITY DISTRIBUTION (CICED), 2018, : 2856 - 2860
- [45] The Assessment of Operational Command And Decision Based on the AHP-Fuzzy Comprehensive Evaluation [J]. Proceedings of the 2016 4th International Conference on Machinery, Materials and Information Technology Applications, 2016, 71 : 334 - 337
- [46] Research on Risk Assessment of Reservoir by AHP-Fuzzy Comprehensive Analysis Method [J]. FRONTIERS OF ADVANCED MATERIALS AND ENGINEERING TECHNOLOGY, PTS 1-3, 2012, 430-432 : 1974 - 1978
- [48] Practical Research and Establishment for Product Quality Evaluation System Based on AHP Fuzzy Comprehensive Evaluation [J]. PROCEEDINGS OF 2ND CONFERENCE ON LOGISTICS, INFORMATICS AND SERVICE SCIENCE (LISS 2012), VOLS 1 AND 2, 2013,
- [49] Study on Comprehensive Evaluation of Mine Construction Project Management Based on AHP-FUZZY [J]. 4TH INTERNATIONAL CONFERENCE ON ADVANCES IN ENERGY RESOURCES AND ENVIRONMENT ENGINEERING, 2019, 237
- [50] Comprehensive evaluation of urban rail transportation planning network based on AHP-fuzzy [J]. Advances in Transportation Studies, 2023, 3 (Special issue): : 79 - 90