Research on Risk Assessment of Reservoir by AHP-Fuzzy Comprehensive Analysis Method

被引:4
|
作者
Tian, Lingang
Liu, Zhi
机构
关键词
Dangerous reservoir; Risk assessment; AHP-Fuzzy comprehensive evaluation;
D O I
10.4028/www.scientific.net/AMR.430-432.1974
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Because of the fuzziness and uncertainty of risk factors in the risk management, using fuzzy comprehensive evaluation model for research. The model not only identifies the main risk factors of the dam, spillway, and water facility, but also quantifies the influence weight by risk factors on dangerous reservoir. The affiliate degrees of risk factors on risk level can be get on the basis of membership function. So the final overall risk level of the dam, spillway, and water facility is able to compare. It will be set the priority to reinforcement measures for dangerous reservoir.
引用
收藏
页码:1974 / 1978
页数:5
相关论文
共 50 条
  • [1] Research on Software Risk Assessment Model based on AHP-Fuzzy Comprehensive Evaluation
    Zhou, Yu
    Hu, Yan
    [J]. 2020 THE 4TH INTERNATIONAL CONFERENCE ON MANAGEMENT ENGINEERING, SOFTWARE ENGINEERING AND SERVICE SCIENCES (ICMSS 2020), 2020, : 16 - 20
  • [2] AHP-Fuzzy Comprehensive Evaluation Method for Enterprise Technology Innovation Risk Assessment and Early Warning Research
    Xing Liman
    Ma Ling
    Li Yanhong
    [J]. PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON RISK MANAGEMENT & ENGINEERING MANAGEMENT, VOLS 1 AND 2, 2008, : 23 - 27
  • [3] Research and application of AHP-fuzzy comprehensive evaluation model
    Zhu, Lingyan
    [J]. EVOLUTIONARY INTELLIGENCE, 2022, 15 (04) : 2403 - 2409
  • [4] Risk assessment of supply chain for pharmaceutical excipients with AHP-fuzzy comprehensive evaluation
    Li, Maozhong
    Du, Yunai
    Wang, Qiyue
    Sun, Chunmeng
    Ling, Xiang
    Yu, Boyang
    Tu, Jiasheng
    Xiong, Yerong
    [J]. DRUG DEVELOPMENT AND INDUSTRIAL PHARMACY, 2016, 42 (04) : 676 - 684
  • [5] Research and application of AHP-fuzzy comprehensive evaluation model
    Lingyan Zhu
    [J]. Evolutionary Intelligence, 2022, 15 : 2403 - 2409
  • [6] The assessment of emergency capability of coal mines based on AHP-fuzzy comprehensive method
    Tong, Shu Jiao
    Wu, Zong Zhi
    Wang, Ru Jun
    Duo, Ying Quan
    [J]. OPERATIONAL AND ENVIRONMENTAL MINE HEALTH AND SAFETY PRACTICE AND INNOVATION, 2016, : 296 - 301
  • [7] STUDY ON RISK MANAGEMENT OF COAL MINE FLOOD BASED ON AHP-FUZZY COMPREHENSIVE EVALUATION ANALYSIS METHOD
    Wang, Yong
    Guan, Nianhui
    Wang, Zihan
    Yan, Han
    Chen, Hongguang
    [J]. FRESENIUS ENVIRONMENTAL BULLETIN, 2021, 30 (4A): : 4436 - 4442
  • [8] Synthetic evaluation of integrated energy system based on AHP-fuzzy comprehensive assessment method
    Lu, Xiao
    Wu, Jiajia
    Hu, Wei
    Chi, Changyun
    Jiang, Xuedong
    Li, Xiaobo
    [J]. 2020 INTERNATIONAL CONFERENCE ON ENERGY, ENVIRONMENT AND BIOENGINEERING (ICEEB 2020), 2020, 185
  • [9] RISK ASSESSMENT OF GRANITE RESERVOIR TESTING IN ULTRA -DEEP WATER BASEMENT BURIED-HILL BASED ON AHP-FUZZY COMPREHENSIVE EVALUATION
    Meng, Wenbo
    Jiang, Donglei
    Yu, Yi
    Dou, Liangbin
    Zuo, Xiongdi
    Fang, Yong
    Chen, Jingyang
    Gao, Hui
    [J]. FRESENIUS ENVIRONMENTAL BULLETIN, 2022, 31 (08): : 8029 - 8036
  • [10] Dust Explosion Risk Assessment for Dry Dust Collector Based on AHP-Fuzzy Comprehensive Evaluation
    Sun, Siheng
    Mao, Tingting
    Lv, Pengfei
    Pang, Lei
    [J]. PROCESSES, 2022, 10 (12)