共 50 条
- [1] Research on Risk Assessment of Reservoir by AHP-Fuzzy Comprehensive Analysis Method [J]. FRONTIERS OF ADVANCED MATERIALS AND ENGINEERING TECHNOLOGY, PTS 1-3, 2012, 430-432 : 1974 - 1978
- [2] Research on Software Risk Assessment Model based on AHP-Fuzzy Comprehensive Evaluation [J]. 2020 THE 4TH INTERNATIONAL CONFERENCE ON MANAGEMENT ENGINEERING, SOFTWARE ENGINEERING AND SERVICE SCIENCES (ICMSS 2020), 2020, : 16 - 20
- [4] Research and application of AHP-fuzzy comprehensive evaluation model [J]. Evolutionary Intelligence, 2022, 15 : 2403 - 2409
- [5] A Study of AHP-Fuzzy Comprehensive Evaluation on the Development of Eco-Enterprise [J]. 2008 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (15TH), VOLS I AND II, CONFERENCE PROCEEDINGS, 2008, : 219 - 224
- [6] The establishment of AHP-Fuzzy model for comprehensive valuation of enterprise technological innovation ability [J]. PROCEEDINGS OF THE FIFTH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2011, : 482 - 485
- [8] Synthetic evaluation of integrated energy system based on AHP-fuzzy comprehensive assessment method [J]. 2020 INTERNATIONAL CONFERENCE ON ENERGY, ENVIRONMENT AND BIOENGINEERING (ICEEB 2020), 2020, 185
- [9] Enterprise Electric Energy Efficiency Evaluation based on AHP-Fuzzy Method [J]. 2018 CHINA INTERNATIONAL CONFERENCE ON ELECTRICITY DISTRIBUTION (CICED), 2018, : 2856 - 2860
- [10] Risk Evaluation for Shipwreck Environmental Pollution Based on AHP-Fuzzy Comprehensive Evaluation [J]. PROGRESS IN ENVIRONMENTAL SCIENCE AND ENGINEERING (ICEESD2011), PTS 1-5, 2012, 356-360 : 2228 - 2232