Study on Comprehensive Evaluation of Mine Construction Project Management Based on AHP-FUZZY

被引:0
|
作者
Gao, Xiaoqiang [1 ]
Zhu, Jingyan [2 ]
机构
[1] China Univ Min & Technol Beijing, Sch Mech & Civil Engn, Beijing 100083, Peoples R China
[2] North China Univ Technol, Sch Civil Engn, Beijing 100144, Peoples R China
关键词
D O I
10.1088/1755-1315/237/3/032137
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Coal mine construction has investment huge, long cycle, high quality characteristics, higher requirements have been put forward for the mine construction project management. This paper establishes the three-level evaluation index system of mine construction project management from four aspects, which include the project goal, the owner, the supervision unit and the contractor, establishes the project management comprehensive evaluation model based on the AHP method and the FUZZY method, and combined with engineering examples to verify. The results show that the evaluation index system of the index is reasonable. The calculation results of the model is proved that the comprehensive evaluation result is the same as the actual result of the project and has good reliability. The evaluation index system and the evaluation model can provide reference for the evaluation of mine construction project management effect.
引用
收藏
页数:6
相关论文
共 50 条
  • [1] STUDY ON RISK MANAGEMENT OF COAL MINE FLOOD BASED ON AHP-FUZZY COMPREHENSIVE EVALUATION ANALYSIS METHOD
    Wang, Yong
    Guan, Nianhui
    Wang, Zihan
    Yan, Han
    Chen, Hongguang
    [J]. FRESENIUS ENVIRONMENTAL BULLETIN, 2021, 30 (4A): : 4436 - 4442
  • [2] THE STUDY ON PERFORMANCE EVALUATION BASED ON AHP-FUZZY
    Han, Na
    Ji, Xiang-Jun
    [J]. PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-6, 2009, : 2750 - 2753
  • [3] Study on Fuzzy Comprehensive Evaluation System in Mine Safety Based on AHP
    Qin, Tao
    Dong, Changji
    Liu, Yongli
    [J]. ADVANCES IN CHEMICAL, MATERIAL AND METALLURGICAL ENGINEERING, PTS 1-5, 2013, 634-638 : 3710 - 3715
  • [4] Risk Evaluation for Shipwreck Environmental Pollution Based on AHP-Fuzzy Comprehensive Evaluation
    Xing, Hui
    Duan, Shulin
    Yu, Hongliang
    Liu, Qin'an
    [J]. PROGRESS IN ENVIRONMENTAL SCIENCE AND ENGINEERING (ICEESD2011), PTS 1-5, 2012, 356-360 : 2228 - 2232
  • [5] A Study of AHP-Fuzzy Comprehensive Evaluation on the Development of Eco-Enterprise
    Xu Jian-zhong
    Wang Li-jing
    Lu Jun
    [J]. 2008 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (15TH), VOLS I AND II, CONFERENCE PROCEEDINGS, 2008, : 219 - 224
  • [6] Cloud computing security evaluation and countermeasure based on AHP-fuzzy comprehensive evaluation
    Yang A.-M.
    Gao F.
    Bian M.-H.
    Yang S.-L.
    [J]. 2016, Editorial Board of Journal on Communications (37): : 104 - 110
  • [7] The Assessment of Operational Command And Decision Based on the AHP-Fuzzy Comprehensive Evaluation
    Xue, Zhao
    Du, Xiaoming
    Pei, Guoxu
    [J]. Proceedings of the 2016 4th International Conference on Machinery, Materials and Information Technology Applications, 2016, 71 : 334 - 337
  • [8] Research on Comprehensive Evaluation of the Students' Vocational Ability Based on AHP-FUZZY
    Liu, Jin
    Pan, Yi
    Yang, Jinhui
    [J]. 2012 INTERNATIONAL CONFERENCE ON CONTROL ENGINEERING AND COMMUNICATION TECHNOLOGY (ICCECT 2012), 2012, : 791 - 793
  • [9] Integration degree of tourism industry based on AHP-fuzzy comprehensive evaluation
    YAN Wei
    [J]. Ecological Economy, 2014, 10 (02) : 172 - 176
  • [10] Research and application of AHP-fuzzy comprehensive evaluation model
    Zhu, Lingyan
    [J]. EVOLUTIONARY INTELLIGENCE, 2022, 15 (04) : 2403 - 2409