Project buffer sizing of a critical chain based on comprehensive resource tightness

被引:72
|
作者
Zhang, Junguang [1 ]
Song, Xiwei [1 ]
Diaz, Estrella [2 ]
机构
[1] Univ Sci & Technol Beijing, Donlinks Sch Econ & Management, Beijing 100083, Peoples R China
[2] Univ Castilla La Mancha, Law & Social Sci Sch, E-13071 Ciudad Real, Spain
关键词
Project buffer; Comprehensive resource tightness; Information resources; Physical resources; Design structure matrix; DESIGN; OPTIMIZATION; MODEL; RISK;
D O I
10.1016/j.ejor.2015.07.009
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
A buffer sizing method based on comprehensive resource tightness is proposed in order to better reflect the relationships between activities and improve the accuracy of project buffer determination. Physical resource tightness is initially determined by setting a critical value of resource availability according to the law of diminishing marginal returns. The design structure matrix (DSM) is then adopted to analyze the information flow between activities and calculate the rework time resulting from the information interaction and the information resource tightness. Finally, the project buffer size is adjusted and determined by means of comprehensive resource tightness which consists of physical resource tightness and information resource tightness. The experimental results indicate that the proposed method considers the effect of comprehensive resource tightness on a project buffer, thus overcoming the deficiencies of traditional methods which consider only physical resource tightness and ignore information resource tightness. The size of the project buffer determined by the proposed method is more reasonable, thus signifying that it can doubly optimize project duration and cost. (C) 2015 Elsevier B.V. and Association of European Operational Research Societies (EURO) within the International Federation of Operational Research Societies (IFORS). All rights reserved.
引用
收藏
页码:174 / 182
页数:9
相关论文
共 50 条
  • [31] Buffer Determination of Critical Chain Project Based on Improved Principal-agent Model
    Zhang J.
    Wang M.
    Tongji Daxue Xuebao/Journal of Tongji University, 2022, 50 (12): : 1833 - 1840
  • [32] Research on the Buffer Sizing Approach in Critical Chain Scheduling in Perspective of Flexible Management
    Ma, Guofeng
    Li, Lei
    Chen, Zhiqin
    BUSINESS, ECONOMICS, FINANCIAL SCIENCES, AND MANAGEMENT, 2012, 143 : 61 - 68
  • [33] Buffer sizing approach with dependence assumption between activities in critical chain scheduling
    Bie, Li
    Cui, Nanfang
    Zhang, Xiaoming
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (24) : 7343 - 7356
  • [34] A heuristic approach for the critical chain project scheduling problem based on resource flows
    Peng, Wuliang
    Wang, Ziyan
    Xie, Fang
    Li, Haitao
    COMPUTERS & OPERATIONS RESEARCH, 2025, 180
  • [35] A framework of critical resource chain for project schedule analysis
    Liu Shu-Shun
    Shih, Kuo-Chuan
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2009, 27 (09) : 857 - 869
  • [36] Research on Integration of Project Schedule Buffer and Cost Buffer Based on Key Chain
    Li Xuemei
    INFORMATION ENGINEERING FOR MECHANICS AND MATERIALS RESEARCH, 2013, 422 : 321 - 326
  • [37] The Interaction Between Critical Chain Sequencing, Buffer Sizing, and Reactive Actions in a CC/BM Framework
    Hu, Xuejun
    Wang, Jianjiang
    Leng, Kaijun
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2019, 36 (03)
  • [38] A new CCPM(critical chain project management) scheduling algorithm based on resource conflict solution
    Li, Junting
    Wang, Runxiao
    Yang, Yuntao
    Xibei Gongye Daxue Xuebao/Journal of Northwestern Polytechnical University, 2010, 28 (04): : 547 - 552
  • [39] A Resource Allocation Method for Multi-Project Management Based on Time Window and Critical Chain
    Qi, Fangzhong
    Hu, Dan
    Ye, Leihong
    2013 INTERNATIONAL CONFERENCE ON MANAGEMENT AND INFORMATION TECHNOLOGY, 2013, : 664 - 671
  • [40] Project buffer sizing and dynamic buffer consumption algorithm in power generation construction
    Zohrehvandi, Shakib
    Khalilzadeh, Mohammad
    Amiri, Maghsoud
    Shadrokh, Shahram
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2022, 29 (02) : 716 - 738