Project buffer sizing of a critical chain based on comprehensive resource tightness

被引:72
|
作者
Zhang, Junguang [1 ]
Song, Xiwei [1 ]
Diaz, Estrella [2 ]
机构
[1] Univ Sci & Technol Beijing, Donlinks Sch Econ & Management, Beijing 100083, Peoples R China
[2] Univ Castilla La Mancha, Law & Social Sci Sch, E-13071 Ciudad Real, Spain
关键词
Project buffer; Comprehensive resource tightness; Information resources; Physical resources; Design structure matrix; DESIGN; OPTIMIZATION; MODEL; RISK;
D O I
10.1016/j.ejor.2015.07.009
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
A buffer sizing method based on comprehensive resource tightness is proposed in order to better reflect the relationships between activities and improve the accuracy of project buffer determination. Physical resource tightness is initially determined by setting a critical value of resource availability according to the law of diminishing marginal returns. The design structure matrix (DSM) is then adopted to analyze the information flow between activities and calculate the rework time resulting from the information interaction and the information resource tightness. Finally, the project buffer size is adjusted and determined by means of comprehensive resource tightness which consists of physical resource tightness and information resource tightness. The experimental results indicate that the proposed method considers the effect of comprehensive resource tightness on a project buffer, thus overcoming the deficiencies of traditional methods which consider only physical resource tightness and ignore information resource tightness. The size of the project buffer determined by the proposed method is more reasonable, thus signifying that it can doubly optimize project duration and cost. (C) 2015 Elsevier B.V. and Association of European Operational Research Societies (EURO) within the International Federation of Operational Research Societies (IFORS). All rights reserved.
引用
收藏
页码:174 / 182
页数:9
相关论文
共 50 条
  • [21] The Setting Method of Project Buffer in Critical Chain Management of Mould manufacturing Project Based Reworking
    Hu, Changwei
    Chen, Xindu
    Wu, Lihua
    EQUIPMENT MANUFACTURING TECHNOLOGY AND AUTOMATION, PTS 1-3, 2011, 317-319 : 418 - 422
  • [22] Differential buffer monitoring for critical chain projects based on comprehensive activity reliability
    Zhang, Junguang
    Wang, Meihua
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2022, 74 (09) : 2064 - 2079
  • [23] Critical chain project buffer monitoring based on integrated attributes and activity preferences
    Zhang, Junguang
    Si, Chenyu
    Wang, Xi
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2024,
  • [24] A hybrid approach based on critical chain for project buffer consumption prediction and monitoring
    Xu, Jiaojiao
    Bai, Sijun
    KYBERNETES, 2024,
  • [25] Dynamic monitoring and control of a critical chain project based on phase buffer allocation
    Zhang, Junguang
    Jia, Saike
    Diaz, Estrella
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2018, 69 (12) : 1966 - 1977
  • [26] An algorithmic framework for improving the performance of the critical chain buffer sizing method
    Ansari, R.
    Makui, A.
    Ghoddousi, P.
    SCIENTIA IRANICA, 2018, 25 (01) : 74 - 92
  • [27] A new buffer sizing approach based on the uncertainty of project activities
    Zhang, Junguang
    Jia, Saike
    Diaz, Estrella
    CONCURRENT ENGINEERING-RESEARCH AND APPLICATIONS, 2015, 23 (01): : 3 - 12
  • [28] A Risk-Oriented Buffer Allocation Model Based on Critical Chain Project Management
    Ghoddousi, Parviz
    Ansari, Ramin
    Makui, Ahmad
    KSCE JOURNAL OF CIVIL ENGINEERING, 2017, 21 (05) : 1536 - 1548
  • [29] A risk-oriented buffer allocation model based on critical chain project management
    Parviz Ghoddousi
    Ramin Ansari
    Ahmad Makui
    KSCE Journal of Civil Engineering, 2017, 21 : 1536 - 1548
  • [30] Applying critical chain in project scheduling and estimating buffer size based on fuzzy technique
    Li, Kun
    Chen, Yun-xiang
    2007 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4, 2007, : 1068 - 1072