Project buffer sizing of a critical chain based on comprehensive resource tightness

被引:72
|
作者
Zhang, Junguang [1 ]
Song, Xiwei [1 ]
Diaz, Estrella [2 ]
机构
[1] Univ Sci & Technol Beijing, Donlinks Sch Econ & Management, Beijing 100083, Peoples R China
[2] Univ Castilla La Mancha, Law & Social Sci Sch, E-13071 Ciudad Real, Spain
关键词
Project buffer; Comprehensive resource tightness; Information resources; Physical resources; Design structure matrix; DESIGN; OPTIMIZATION; MODEL; RISK;
D O I
10.1016/j.ejor.2015.07.009
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
A buffer sizing method based on comprehensive resource tightness is proposed in order to better reflect the relationships between activities and improve the accuracy of project buffer determination. Physical resource tightness is initially determined by setting a critical value of resource availability according to the law of diminishing marginal returns. The design structure matrix (DSM) is then adopted to analyze the information flow between activities and calculate the rework time resulting from the information interaction and the information resource tightness. Finally, the project buffer size is adjusted and determined by means of comprehensive resource tightness which consists of physical resource tightness and information resource tightness. The experimental results indicate that the proposed method considers the effect of comprehensive resource tightness on a project buffer, thus overcoming the deficiencies of traditional methods which consider only physical resource tightness and ignore information resource tightness. The size of the project buffer determined by the proposed method is more reasonable, thus signifying that it can doubly optimize project duration and cost. (C) 2015 Elsevier B.V. and Association of European Operational Research Societies (EURO) within the International Federation of Operational Research Societies (IFORS). All rights reserved.
引用
收藏
页码:174 / 182
页数:9
相关论文
共 50 条
  • [41] Improved critical chain buffer management framework considering resource costs and schedule stability
    Xuejun Hu
    Erik Demeulemeester
    Nanfang Cui
    Jianjiang Wang
    Wendi Tian
    Flexible Services and Manufacturing Journal, 2017, 29 : 159 - 183
  • [42] Improved critical chain buffer management framework considering resource costs and schedule stability
    Hu, Xuejun
    Demeulemeester, Erik
    Cui, Nanfang
    Wang, Jianjiang
    Tian, Wendi
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2017, 29 (02) : 159 - 183
  • [43] Buffer Setting Method of Critical Chain Based on Information Entropy
    Gong J.
    Hu T.
    Yao L.
    Zidonghua Xuebao/Acta Automatica Sinica, 2022, 48 (08): : 2039 - 2049
  • [44] PROJECT BUFFER SETTING AND DYNAMIC MONITORING OF A CRITICAL CHAIN ON CONSIDERATION OF MULTIPLE RISK FACTORS
    Huang, Jianwen
    Wang, Qiong
    Chen, Meng
    Wang, Xingxia
    Wang, Yufeng
    Tian, Dongwei
    UPB Scientific Bulletin, Series D: Mechanical Engineering, 2022, 84 (01): : 265 - 276
  • [45] Predicting penetration of the project buffer time of critical chain project management (CCPM) using a linear programming approach
    Jagtap, Milind
    IIM KOZHIKODE SOCIETY & MANAGEMENT REVIEW, 2020, 9 (02) : 143 - 151
  • [46] A heuristic buffer sizing algorithm for implementing a renewable energy project
    Zohrehvandi, Shakib
    Khalilzadeh, Mohammad
    Amiri, Maghsoud
    Shadrokh, Shahram
    AUTOMATION IN CONSTRUCTION, 2020, 117
  • [47] Critical Chain Based on Management of Project Scheduling Risk
    Jiang Guoping
    PROCEEDINGS OF THE 5TH INTERNATIONAL CONFERENCE ON INNOVATION & MANAGEMENT, VOLS I AND II, 2008, : 1428 - 1431
  • [48] Fuzzy-critical-chain-based project management
    Chen, Ming-Kuen
    Hsu, Shin-Peng
    Journal of the Chinese Institute of Industrial Engineers, 2004, 21 (02): : 167 - 176
  • [49] Research on Software Project Schedule Based on Critical Chain
    Xu Huihua
    Wan Li
    Xue Song
    2019 5TH INTERNATIONAL CONFERENCE ON ENERGY MATERIALS AND ENVIRONMENT ENGINEERING, 2019, 295
  • [50] PROJECT SCHEDULE MANAGEMENT BASED ON CRITICAL CHAIN METHOD
    Yu, Lianghui
    Jia, Ling
    Zhou, Dandan
    ICIM 2010: PROCEEDINGS OF THE TENTH INTERNATIONAL CONFERENCE ON INDUSTRIAL MANAGEMENT, 2010, : 269 - 273