Buffer Determination of Critical Chain Project Based on Improved Principal-agent Model

被引:0
|
作者
Zhang, Junguang [1 ]
Wang, Meihua [1 ]
机构
[1] School of Economics and Management, University of Science and Technology Beijing, Beijing,100083, China
来源
关键词
Breakthrough point - Buffer determination - Critical chain - Determination methods - Optimization goals - Principal agent models - Principal agents - Project-based - Trust relationship - Vertical trust;
D O I
10.11908/j.issn.0253-374x.21240
中图分类号
学科分类号
摘要
On the ground that previous buffer determination methods do not pay much attention to the psychological and behavior impact on the safety time extraction, based on the principal-agent model, this study selects the vertical trust between employees and supervisors as the breakthrough point by taking into consideration of the influence of factors such as trust relationship and behavior preference on the determination of buffer. It takes the maximum benefit of both parties as the optimization goal to solve the effort level of employees and determine the safety time of activities. This method is validated by Monte-Carlo simulation and proves to be appropriate to protect the project with reasonable buffer. The duration is shortened, and the project completion is guaranteed. © 2022 Science Press. All rights reserved.
引用
收藏
页码:1833 / 1840
相关论文
共 50 条
  • [1] Model of Supply Chain Partnership based on principal-agent mechanism
    Sun, Yongjun
    Pan, Xiaohong
    Cheng, Yaodong
    Zhong, Zhigang
    Qi, Fangzhong
    [J]. Gaojishu Tongxin/High Technology Letters, 2002, 12 (10):
  • [2] Principal-Agent Model Analysis of Agent Construction for Expressway Project
    Tang Baiyuan
    Du Chengxiang
    [J]. PROCEEDINGS OF THE 4TH INTERNATIONAL CONFERENCE ON PRODUCT INNOVATION MANAGEMENT, VOLS I AND II, 2009, : 1012 - 1016
  • [3] Trade credit term determination under supply chain coordination: A principal-agent model
    Shi, Xiao-Jun
    Zhang, Zhen-Xia
    Zhu, Fang-Fei
    [J]. ADVANCED INTELLIGENT COMPUTING THEORIES AND APPLICATIONS: WITH ASPECTS OF THEORETICAL AND METHODOLOGICAL ISSUES, 2007, 4681 : 56 - +
  • [4] Principal-agent model of trade promotion strategies in supply chain
    Huang, Xiao-Yuan
    Lu, Zhen
    Zhang, Zhe
    [J]. Dongbei Daxue Xuebao/Journal of Northeastern University, 2002, 23 (01): : 79 - 82
  • [5] Study on the Project Supervision System Based on the Principal-Agent Theory
    Zhang, Runtong
    Zhou, Yang
    Zhuang, Hongnan
    Zhu, Xiaomin
    [J]. JOURNAL OF INDUSTRIAL ENGINEERING AND MANAGEMENT-JIEM, 2015, 8 (02): : 491 - 508
  • [6] A principal-agent model of corruption
    Groenendijk, N
    [J]. CRIME LAW AND SOCIAL CHANGE, 1997, 27 (3-4) : 207 - 229
  • [7] Strategies in the principal-agent model
    Mirrlees, James
    Raimondo, Roberto C.
    [J]. ECONOMIC THEORY, 2013, 53 (03) : 605 - 656
  • [8] A principal-agent model of corruption
    Nico Groenendijk
    [J]. Crime, Law and Social Change, 1997, 27 : 207 - 229
  • [9] Strategies in the principal-agent model
    James Mirrlees
    Roberto C. Raimondo
    [J]. Economic Theory, 2013, 53 : 605 - 656
  • [10] Determination of critical chain project buffer based on information flow interactions
    Zhang, Junguang
    Song, Xiwei
    Chen, Hongyu
    Shi, Ruixia
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2016, 67 (09) : 1146 - 1157