Project buffer sizing of a critical chain based on comprehensive resource tightness

被引:72
|
作者
Zhang, Junguang [1 ]
Song, Xiwei [1 ]
Diaz, Estrella [2 ]
机构
[1] Univ Sci & Technol Beijing, Donlinks Sch Econ & Management, Beijing 100083, Peoples R China
[2] Univ Castilla La Mancha, Law & Social Sci Sch, E-13071 Ciudad Real, Spain
关键词
Project buffer; Comprehensive resource tightness; Information resources; Physical resources; Design structure matrix; DESIGN; OPTIMIZATION; MODEL; RISK;
D O I
10.1016/j.ejor.2015.07.009
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
A buffer sizing method based on comprehensive resource tightness is proposed in order to better reflect the relationships between activities and improve the accuracy of project buffer determination. Physical resource tightness is initially determined by setting a critical value of resource availability according to the law of diminishing marginal returns. The design structure matrix (DSM) is then adopted to analyze the information flow between activities and calculate the rework time resulting from the information interaction and the information resource tightness. Finally, the project buffer size is adjusted and determined by means of comprehensive resource tightness which consists of physical resource tightness and information resource tightness. The experimental results indicate that the proposed method considers the effect of comprehensive resource tightness on a project buffer, thus overcoming the deficiencies of traditional methods which consider only physical resource tightness and ignore information resource tightness. The size of the project buffer determined by the proposed method is more reasonable, thus signifying that it can doubly optimize project duration and cost. (C) 2015 Elsevier B.V. and Association of European Operational Research Societies (EURO) within the International Federation of Operational Research Societies (IFORS). All rights reserved.
引用
收藏
页码:174 / 182
页数:9
相关论文
共 50 条
  • [1] Critical chain project buffer sizing based on resource constraints
    Zhang, Junguang
    Song, Xiwei
    Diaz, Estrella
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (03) : 671 - 683
  • [2] Incorporation of resource reliability into critical chain project management buffer sizing
    Zarghami, Seyed Ashkan
    Gunawan, Indra
    de Zubielqui, Graciela Corral
    Baroudi, Bassam
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2020, 58 (20) : 6130 - 6144
  • [3] Project Characteristics Based Buffer Sizing to Critical Chain Scheduling
    Guo Ze
    Zheng Zheng
    Lin ShuMin
    Yang RuiFeng
    PROCEEDINGS OF THE 31ST CHINESE CONTROL CONFERENCE, 2012, : 2400 - 2405
  • [4] Critical Chain Project Buffer Sizing Based on Capabilities Attributes
    Zhang, Junguang
    Guo, Shanshan
    ENGINEERING MANAGEMENT JOURNAL, 2025,
  • [5] Buffer sizing and critical chain project management
    Transportation Development Research Center, China Academy of Transportation Science, Beijing 100029, China
    Jisuanji Jicheng Zhizao Xitong, 2008, 5 (1029-1035):
  • [6] Buffer sizing for the critical chain project management method
    Geekie, A.
    Steyn, H.
    SOUTH AFRICAN JOURNAL OF INDUSTRIAL ENGINEERING, 2008, 19 (01): : 73 - 88
  • [7] Buffer sizing in critical chain project management by network decomposition *
    She, Bingling
    Chen, Bo
    Hall, Nicholas G.
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2021, 102
  • [8] Buffer Sizing Methods to Compare Critical Chain Project Management with Critical Path
    Shurrab, Mohammed
    Abbasi, Ghaleb
    INTERNATIONAL JOURNAL OF INFORMATION TECHNOLOGY PROJECT MANAGEMENT, 2016, 7 (03) : 74 - 87
  • [9] Buffer Sizing in Critical Chain Project Management by Brittle Risk Entropy
    Peng, Jun-long
    Peng, Chao
    BUILDINGS, 2022, 12 (09)
  • [10] Buffer sizing of critical chain based on attribute optimization
    Zhang, Junguang
    Song, Xiwei
    Diaz, Estrella
    CONCURRENT ENGINEERING-RESEARCH AND APPLICATIONS, 2014, 22 (03): : 253 - 264