共 50 条
- [41] A Fuzzy Feedback Scheduling Algorithm for Restraining Resource-constrained Systems Jitter [J]. 2013 32ND CHINESE CONTROL CONFERENCE (CCC), 2013, : 2431 - 2436
- [46] An Extended CPM for Resource-constrained Project Scheduling [J]. ULTRA-PRECISION MACHINING TECHNOLOGIES, 2009, 69-70 : 695 - 699
- [47] Resource-constrained project scheduling problem with reworking [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2019, 25 (11): : 2762 - 2774
- [48] A Practical Approach for Resource-Constrained Project Scheduling [J]. IEEE ACCESS, 2024, 12 : 12976 - 12991
- [50] Resource-constrained formulation for production scheduling and maintenance [J]. 27TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, PT B, 2017, 40B : 1375 - 1380